Traditional Soft Surface-Ripened Cheese Flow

Product family: 250g Wooden-Box Camembert.

Flow: Raw/Thermized Milk → Pre-Drain Hoop Ladling → Brine Bath & Penicillium Mist → 12-Day Humidity Cellar Affinage → Micro-Perforated Paper Wrap → Poplar Wood Box & +4°C Out → Retail Cheese Counters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Traditional Soft Surface-Ripened Cheese FlowSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Raw/Thermized Milk → Pre-Drain Hoop Ladling (4.0 s) → Brine Bath & Penicillium Mist (4.8 s) → 12-Day Humidity Cellar Affinage (6.4 s) → Micro-Perforated Paper Wrap (5.0 s) → Poplar Wood Box & +4°C Out (3.7 s) → Retail Cheese Counters.SUPPLIERRaw/ThermizedMilkI1.20 d1Pre-Drain HoopLadlingC/T 4.0 sI1.10 d2Brine Bath &Penicillium MistC/T 4.8 sI1.50 d312-Day HumidityCellar AffinageC/T 6.4 sI0.90 d4Micro-PerforatedPaper WrapC/T 5.0 sI1.10 d5Poplar Wood Box &+4°C OutC/T 3.7 sI1.40 dCUSTOMERRetail CheeseCounters9,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pre-Drain Hoop Ladling4.0 s25 min95%99.1%9,00010,800 (1.20 d)12,357
2. Brine Bath & Penicillium Mist4.8 s35 min92%98.4%7,2009,900 (1.10 d)9,689
3. 12-Day Humidity Cellar Affinage6.4 s85 min81%97.5%9,00013,500 (1.50 d)6,034
4. Micro-Perforated Paper Wrap5.0 s30 min90%97.9%4,5008,100 (0.90 d)8,881
5. Poplar Wood Box & +4°C Out3.7 s12 min96%99.4%3,6009,900 (1.10 d)13,463

Key figures

Takt time
6.0 s
Lead time
7.20 d
Value-added time
23.9 s
Process cycle efficiency (PCE)
0.006%
Rolled throughput yield (RTY)
92.5%
Customer demand per day
9,000 packs
Line capacity per day
6,034 packs
Bottleneck
12-Day Humidity Cellar Affinage

Reading the bottleneck

The bottleneck is "12-Day Humidity Cellar Affinage": it can process 6,034 packs per day against a demand of 9,000 packs, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 6.4 s to 8.1 s, against a takt of 6.0 s. The largest loss at this step is equipment downtime (uptime 81%), about 1.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.