Continuous Churn Cultured Butter Parchment Wrap
Product family: 250g Foil-Wrapped Bricks.
Flow: High-Fat Fresh Cream → Cream Aging & Continuous Churn → Vacuum Texturizer & Salt Dose → 80-bpm Foil Parchment Wrap → Inline Metal & Weight Sort → +4°C Case Box & Chilled Dock → Grocery Dairy Counters
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Cream Aging & Continuous Churn | 2.0 s | 25 min | 95% | 99.1% | 18,000 | 21,600 (1.20 d) | 24,713 |
| 2. Vacuum Texturizer & Salt Dose | 2.4 s | 35 min | 92% | 98.4% | 14,400 | 19,800 (1.10 d) | 19,379 |
| 3. 80-bpm Foil Parchment Wrap | 3.2 s | 85 min | 81% | 97.5% | 18,000 | 27,000 (1.50 d) | 12,068 |
| 4. Inline Metal & Weight Sort | 2.5 s | 30 min | 90% | 97.9% | 9,000 | 16,200 (0.90 d) | 17,763 |
| 5. +4°C Case Box & Chilled Dock | 1.9 s | 12 min | 96% | 99.4% | 7,200 | 19,800 (1.10 d) | 26,216 |
Key figures
- Takt time
- 3.0 s
- Lead time
- 7.20 d
- Value-added time
- 12.0 s
- Process cycle efficiency (PCE)
- 0.003%
- Rolled throughput yield (RTY)
- 92.5%
- Customer demand per day
- 18,000 packs
- Line capacity per day
- 12,068 packs
- Bottleneck
- 80-bpm Foil Parchment Wrap
Reading the bottleneck
The bottleneck is "80-bpm Foil Parchment Wrap": it can process 12,068 packs per day against a demand of 18,000 packs, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 3.2 s to 4.1 s, against a takt of 3.0 s. The largest loss at this step is equipment downtime (uptime 81%), about 0.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Dairy, UHT & Plant-Based Alt: Dairy, UHT & Plant-Based Alt
- UHT Aseptic Dairy Processing & Filling
- Ultrafiltered Stirred Greek Yogurt Cup Line
- Continuous Pasta-Filata Mozzarella Shred & Ball
- Enzymatic Oat Hydrolysis UHT Plant-Milk Line
- GMP Stage-1 Spray-Dried Infant Formula Can Line
- Rotary Extruded Chocolate-Dipped Ice Cream Bar
- Microfiltered Whey Isolate (WPI) Pouch & Tub Line
- Traditional Soft Surface-Ripened Cheese Flow
- Live 12-Strain Cultured Kefir PET Bottle
- Vacuum Evaporated Sweetened Condensed Milk Can
- Coconut-Starch Plant-Based Sliced Cheese Line