Rotary Extruded Chocolate-Dipped Ice Cream Bar

Product family: Multi-Pack Novelty Sticks.

Flow: Cream, Cocoa & Sugar Tanks → Continuous Freezer Whip -6°C → Rotary Extrusion & Stick Insert → -38°C Hardening Liquid N2 → Double Choc & Nut Dip Coat → Auto Flowpack & -25°C Case → Cold Frozen Retail Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Rotary Extruded Chocolate-Dipped Ice Cream BarSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cream, Cocoa & Sugar Tanks → Continuous Freezer Whip -6°C (1.6 s) → Rotary Extrusion & Stick Insert (2.0 s) → -38°C Hardening Liquid N2 (2.6 s) → Double Choc & Nut Dip Coat (2.1 s) → Auto Flowpack & -25°C Case (1.5 s) → Cold Frozen Retail Hubs.SUPPLIERCream, Cocoa &Sugar TanksI1.20 d1ContinuousFreezer Whip -6°CC/T 1.6 sI1.10 d2Rotary Extrusion& Stick InsertC/T 2.0 sI1.50 d3-38°C HardeningLiquid N2C/T 2.6 sI0.90 d4Double Choc & NutDip CoatC/T 2.1 sI1.10 d5Auto Flowpack &-25°C CaseC/T 1.5 sI1.40 dCUSTOMERCold FrozenRetail Hubs22,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Continuous Freezer Whip -6°C1.6 s25 min95%99.1%22,00026,400 (1.20 d)30,891
2. Rotary Extrusion & Stick Insert2.0 s35 min92%98.4%17,60024,200 (1.10 d)23,254
3. -38°C Hardening Liquid N22.6 s85 min81%97.5%22,00033,000 (1.50 d)14,853
4. Double Choc & Nut Dip Coat2.1 s30 min90%97.9%11,00019,800 (0.90 d)21,146
5. Auto Flowpack & -25°C Case1.5 s12 min96%99.4%8,80024,200 (1.10 d)33,208

Key figures

Takt time
2.5 s
Lead time
7.20 d
Value-added time
9.8 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
92.5%
Customer demand per day
22,000 packs
Line capacity per day
14,853 packs
Bottleneck
-38°C Hardening Liquid N2

Reading the bottleneck

The bottleneck is "-38°C Hardening Liquid N2": it can process 14,853 packs per day against a demand of 22,000 packs, so it falls short of demand by 32.5%. Once downtime and scrap are counted, its cycle time grows from 2.6 s to 3.3 s, against a takt of 2.5 s. The largest loss at this step is equipment downtime (uptime 81%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.