Live 12-Strain Cultured Kefir PET Bottle

Product family: 500mL Probiotic Dairy Drinks.

Flow: Fresh Milk & Kefir Grains → 16h Tank Yeast/Bacteria Ferment → Gentle Shearing Cool Down → Clean-Fill PET Effervesce Cap → Full Sleeve Tamper Label → +4°C Cold Storage Shipping → Health Groceries

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Live 12-Strain Cultured Kefir PET BottleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Fresh Milk & Kefir Grains → 16h Tank Yeast/Bacteria Ferment (3.1 s) → Gentle Shearing Cool Down (3.8 s) → Clean-Fill PET Effervesce Cap (5.0 s) → Full Sleeve Tamper Label (3.9 s) → +4°C Cold Storage Shipping (2.9 s) → Health Groceries.SUPPLIERFresh Milk &Kefir GrainsI1.20 d116h TankYeast/Bacteria…C/T 3.1 sI1.10 d2Gentle ShearingCool DownC/T 3.8 sI1.50 d3Clean-Fill PETEffervesce CapC/T 5.0 sI0.90 d4Full SleeveTamper LabelC/T 3.9 sI1.10 d5+4°C Cold StorageShippingC/T 2.9 sI1.40 dCUSTOMERHealthGroceries11,500 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 16h Tank Yeast/Bacteria Ferment3.1 s25 min95%99.1%11,50013,800 (1.20 d)15,944
2. Gentle Shearing Cool Down3.8 s35 min92%98.4%9,20012,650 (1.10 d)12,239
3. Clean-Fill PET Effervesce Cap5.0 s85 min81%97.5%11,50017,250 (1.50 d)7,724
4. Full Sleeve Tamper Label3.9 s30 min90%97.9%5,75010,350 (0.90 d)11,387
5. +4°C Cold Storage Shipping2.9 s12 min96%99.4%4,60012,650 (1.10 d)17,176

Key figures

Takt time
4.7 s
Lead time
7.20 d
Value-added time
18.7 s
Process cycle efficiency (PCE)
0.005%
Rolled throughput yield (RTY)
92.5%
Customer demand per day
11,500 packs
Line capacity per day
7,724 packs
Bottleneck
Clean-Fill PET Effervesce Cap

Reading the bottleneck

The bottleneck is "Clean-Fill PET Effervesce Cap": it can process 7,724 packs per day against a demand of 11,500 packs, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 5.0 s to 6.3 s, against a takt of 4.7 s. The largest loss at this step is equipment downtime (uptime 81%), about 1.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Dairy, UHT & Plant-Based Alt: Dairy, UHT & Plant-Based Alt