Coconut-Starch Plant-Based Sliced Cheese Line
Product family: 200g Resealable Block Slices.
Flow: Refined Coconut Oil & Starch → Twin-Screw Steam Melt Emulsify → Chilled Block Mold 24h Set → High-Speed Orbital Log Slicer → MAP Gas-Flush Reclose Tray → X-Ray & +4°C Palletize → Supermarkets & Burger Chains
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Twin-Screw Steam Melt Emulsify | 2.7 s | 25 min | 95% | 99.1% | 13,000 | 15,600 (1.20 d) | 18,306 |
| 2. Chilled Block Mold 24h Set | 3.3 s | 35 min | 92% | 98.4% | 10,400 | 14,300 (1.10 d) | 14,094 |
| 3. High-Speed Orbital Log Slicer | 4.4 s | 85 min | 81% | 97.5% | 13,000 | 19,500 (1.50 d) | 8,777 |
| 4. MAP Gas-Flush Reclose Tray | 3.5 s | 30 min | 90% | 97.9% | 6,500 | 11,700 (0.90 d) | 12,688 |
| 5. X-Ray & +4°C Palletize | 2.6 s | 12 min | 96% | 99.4% | 5,200 | 14,300 (1.10 d) | 19,158 |
Key figures
- Takt time
- 4.2 s
- Lead time
- 7.20 d
- Value-added time
- 16.5 s
- Process cycle efficiency (PCE)
- 0.004%
- Rolled throughput yield (RTY)
- 92.5%
- Customer demand per day
- 13,000 packs
- Line capacity per day
- 8,777 packs
- Bottleneck
- High-Speed Orbital Log Slicer
Reading the bottleneck
The bottleneck is "High-Speed Orbital Log Slicer": it can process 8,777 packs per day against a demand of 13,000 packs, so it falls short of demand by 32.5%. Once downtime and scrap are counted, its cycle time grows from 4.4 s to 5.6 s, against a takt of 4.2 s. The largest loss at this step is equipment downtime (uptime 81%), about 1.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Dairy, UHT & Plant-Based Alt: Dairy, UHT & Plant-Based Alt
- UHT Aseptic Dairy Processing & Filling
- Ultrafiltered Stirred Greek Yogurt Cup Line
- Continuous Pasta-Filata Mozzarella Shred & Ball
- Enzymatic Oat Hydrolysis UHT Plant-Milk Line
- GMP Stage-1 Spray-Dried Infant Formula Can Line
- Rotary Extruded Chocolate-Dipped Ice Cream Bar
- Microfiltered Whey Isolate (WPI) Pouch & Tub Line
- Continuous Churn Cultured Butter Parchment Wrap
- Traditional Soft Surface-Ripened Cheese Flow
- Live 12-Strain Cultured Kefir PET Bottle
- Vacuum Evaporated Sweetened Condensed Milk Can