Frozen Meals, Retort & Pet Food VSM Scenarios
12 scenarios of Frozen Meals, Retort & Pet Food, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Protein / Veg Prep & Batch Mix → Spiral Blast Freeze / Extrude → Sterile Retort / Multi-Head Pouch → X-Ray Bone/Plastic Detect → Cold -20°C / Case Palletizing. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 12-Ton/Hr Extruded Complete Dry Dog Kibble Line | 6,400 packs per day | 3 | 12.7 s | 8.00 d | 0.008% | Gas Multi-Pass Belt Dryer |
| 85g Chunks-in-Gravy Wet Cat Food Retort Pouch | 58,000 packs per day | 3 | 1.4 s | 8.00 d | 0.001% | Multi-Head Meat + Gravy Fill |
| Fresh Harvest Pea Pod, Blanch & IQF Bagging | 24,000 packs per day | 3 | 3.4 s | 8.00 d | 0.002% | Fluidized Belt IQF Freeze |
| Wood-Fired Stone-Baked Frozen Pizza Assembly | 28,000 packs per day | 2 | 1.9 s | 8.00 d | 0.002% | Waterjet Sauce, Cheese & Topping |
| 20-Ton/Hr Water-Gun Cut Par-Fried French Fries | 18,000 packs per day | 3 | 4.5 s | 8.00 d | 0.003% | Optical Defect Laser & Blanch |
| Dual-Ovenable CPET Ready-to-Eat Meal Line | 16,000 packs per day | 2 | 3.4 s | 8.00 d | 0.003% | Lidding Peel Film & Blast Chill |
| Vacuum Sublimation Freeze-Dried Strawberry Line | 9,500 packs per day | 2 | 5.7 s | 8.00 d | 0.005% | Low-RH <10% Dry Nitrogen Room |
| Folded Gyoza & Dumpling Steaming IQF Line | 18,000 packs per day | 2 | 3.0 s | 8.00 d | 0.003% | Direct Steam Gel Tunnel |
| Vacuum Sterilized Organic Baby Food Glass Jar | 28,000 packs per day | 2 | 1.9 s | 8.00 d | 0.002% | Overpressure Water Autoclave |
| IQF Portion-Control Frozen Smoothie Cubes | 14,000 packs per day | 2 | 3.9 s | 8.00 d | 0.003% | -38°C Cryo Demold & Harden |
| 18-Hour Slow-Simmer Retort Carton Bone Broth | 11,000 packs per day | 2 | 4.9 s | 8.00 d | 0.004% | Form-Fill Retort Paperboard |
| Food-Grade Ozone-Filtered Party Ice Cube Plant | 22,000 packs per day | 2 | 2.5 s | 8.00 d | 0.002% | Screw Dewater & Screen Fines |