20-Ton/Hr Water-Gun Cut Par-Fried French Fries

Product family: 2.5kg QSR Crisp Fry Bags.

Flow: Russet Storage Sheds → Steam Peel & Brush Wash → Hydro-Jet Blade Block Cut → Optical Defect Laser & Blanch → Flash Par-Fry & IQF Freeze → Auto Weigh 2.5kg Poly-Bag → Global QSR Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 20-Ton/Hr Water-Gun Cut Par-Fried French FriesSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Russet Storage Sheds → Steam Peel & Brush Wash (3.1 s) → Hydro-Jet Blade Block Cut (3.8 s) → Optical Defect Laser & Blanch (4.9 s) → Flash Par-Fry & IQF Freeze (3.2 s) → Auto Weigh 2.5kg Poly-Bag (2.6 s) → Global QSR Chains.SUPPLIERRusset StorageShedsI1.10 d1Steam Peel &Brush WashC/T 3.1 sI1.30 d2Hydro-Jet BladeBlock CutC/T 3.8 sI1.80 d3Optical DefectLaser & BlanchC/T 4.9 sI0.80 d4Flash Par-Fry &IQF FreezeC/T 3.2 sI1.20 d5Auto Weigh 2.5kgPoly-BagC/T 2.6 sI1.80 dCUSTOMERGlobal QSRChains18,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Steam Peel & Brush Wash3.1 s25 min95%98.8%14,40019,800 (1.10 d)23,957
2. Hydro-Jet Blade Block Cut3.8 s40 min90%97.5%14,40023,400 (1.30 d)18,012
3. Optical Defect Laser & Blanch4.9 s55 min84%96.2%18,00032,400 (1.80 d)12,814
4. Flash Par-Fry & IQF Freeze3.2 s8 min96%98.9%5,40014,400 (0.80 d)23,558
5. Auto Weigh 2.5kg Poly-Bag2.6 s10 min97%99.4%5,40021,600 (1.20 d)29,296

Key figures

Takt time
4.5 s
Lead time
8.00 d
Value-added time
17.6 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
91.1%
Customer demand per day
18,000 packs
Line capacity per day
12,814 packs
Bottleneck
Optical Defect Laser & Blanch

Reading the bottleneck

The bottleneck is "Optical Defect Laser & Blanch": it can process 12,814 packs per day against a demand of 18,000 packs, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 4.9 s to 6.1 s, against a takt of 4.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Frozen Meals, Retort & Pet Food: Frozen Meals, Retort & Pet Food