Wood-Fired Stone-Baked Frozen Pizza Assembly

Product family: 420g Retail Shrink Pizzas.

Flow: Cheese Dicing & Tomato → Press Dough & Proof Belt → Impingement Stone Pre-Bake → Waterjet Sauce, Cheese & Topping → -35°C Spiral Blast Tunnel → Auto Shrink & Folded Carton → Supermarket Freezers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Wood-Fired Stone-Baked Frozen Pizza AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cheese Dicing & Tomato → Press Dough & Proof Belt (1.3 s) → Impingement Stone Pre-Bake (1.6 s) → Waterjet Sauce, Cheese & Topping (2.1 s) → -35°C Spiral Blast Tunnel (1.4 s) → Auto Shrink & Folded Carton (1.2 s) → Supermarket Freezers.SUPPLIERCheese Dicing &TomatoI1.10 d1Press Dough &Proof BeltC/T 1.3 sI1.30 d2Impingement StonePre-BakeC/T 1.6 sI1.80 d3Waterjet Sauce,Cheese & ToppingC/T 2.1 sI0.80 d4-35°C SpiralBlast TunnelC/T 1.4 sI1.20 d5Auto Shrink &Folded CartonC/T 1.2 sI1.80 dCUSTOMERSupermarketFreezers28,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Press Dough & Proof Belt1.3 s25 min95%98.8%22,40030,800 (1.10 d)37,634
2. Impingement Stone Pre-Bake1.6 s40 min90%97.5%22,40036,400 (1.30 d)27,970
3. Waterjet Sauce, Cheese & Topping2.1 s55 min84%96.2%28,00050,400 (1.80 d)19,509
4. -35°C Spiral Blast Tunnel1.4 s8 min96%98.9%8,40022,400 (0.80 d)35,536
5. Auto Shrink & Folded Carton1.2 s10 min97%99.4%8,40033,600 (1.20 d)41,781

Key figures

Takt time
1.9 s
Lead time
8.00 d
Value-added time
7.6 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
91.1%
Customer demand per day
28,000 packs
Line capacity per day
19,509 packs
Bottleneck
Waterjet Sauce, Cheese & Topping

Reading the bottleneck

The bottleneck is "Waterjet Sauce, Cheese & Topping": it can process 19,509 packs per day against a demand of 28,000 packs, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 2.1 s to 2.6 s, against a takt of 1.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.