Vacuum Sterilized Organic Baby Food Glass Jar
Product family: 190g Puree Safety-Button Jars.
Flow: Organic Farm Orchards → Micro-Mill Vacuum De-Aerate → 180°C Hot Fill & Twist Cap → Overpressure Water Autoclave → Dud Cap Vacuum Click Sensor → 6-Jar Shrink Sleeve Pack → Pharmacy & Grocery Baby
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Micro-Mill Vacuum De-Aerate | 1.3 s | 25 min | 95% | 98.8% | 22,400 | 30,800 (1.10 d) | 37,634 |
| 2. 180°C Hot Fill & Twist Cap | 1.6 s | 40 min | 90% | 97.5% | 22,400 | 36,400 (1.30 d) | 27,970 |
| 3. Overpressure Water Autoclave | 2.1 s | 55 min | 84% | 96.2% | 28,000 | 50,400 (1.80 d) | 19,509 |
| 4. Dud Cap Vacuum Click Sensor | 1.4 s | 8 min | 96% | 98.9% | 8,400 | 22,400 (0.80 d) | 35,536 |
| 5. 6-Jar Shrink Sleeve Pack | 1.2 s | 10 min | 97% | 99.4% | 8,400 | 33,600 (1.20 d) | 41,781 |
Key figures
- Takt time
- 1.9 s
- Lead time
- 8.00 d
- Value-added time
- 7.6 s
- Process cycle efficiency (PCE)
- 0.002%
- Rolled throughput yield (RTY)
- 91.1%
- Customer demand per day
- 28,000 packs
- Line capacity per day
- 19,509 packs
- Bottleneck
- Overpressure Water Autoclave
Reading the bottleneck
The bottleneck is "Overpressure Water Autoclave": it can process 19,509 packs per day against a demand of 28,000 packs, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 2.1 s to 2.6 s, against a takt of 1.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Frozen Meals, Retort & Pet Food: Frozen Meals, Retort & Pet Food
- 12-Ton/Hr Extruded Complete Dry Dog Kibble Line
- 85g Chunks-in-Gravy Wet Cat Food Retort Pouch
- Fresh Harvest Pea Pod, Blanch & IQF Bagging
- Wood-Fired Stone-Baked Frozen Pizza Assembly
- 20-Ton/Hr Water-Gun Cut Par-Fried French Fries
- Dual-Ovenable CPET Ready-to-Eat Meal Line
- Vacuum Sublimation Freeze-Dried Strawberry Line
- Folded Gyoza & Dumpling Steaming IQF Line
- IQF Portion-Control Frozen Smoothie Cubes
- 18-Hour Slow-Simmer Retort Carton Bone Broth
- Food-Grade Ozone-Filtered Party Ice Cube Plant