Vacuum Sublimation Freeze-Dried Strawberry Line

Product family: Crunchy Crisp Fruit Pouches.

Flow: IQF Berry Cold Farms → Frozen Tray Load & Weight → -45°C Vacuum Freeze-Dry Cycle → Low-RH <10% Dry Nitrogen Room → Metal Screen & Rotary Pouch → O2-Scavenger Insert & Case → Snacking & Cereal Co-Packers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Vacuum Sublimation Freeze-Dried Strawberry LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. IQF Berry Cold Farms → Frozen Tray Load & Weight (3.9 s) → -45°C Vacuum Freeze-Dry Cycle (4.8 s) → Low-RH <10% Dry Nitrogen Room (6.1 s) → Metal Screen & Rotary Pouch (4.1 s) → O2-Scavenger Insert & Case (3.3 s) → Snacking & Cereal Co-Packers.SUPPLIERIQF Berry ColdFarmsI1.10 d1Frozen Tray Load& WeightC/T 3.9 sI1.30 d2-45°C VacuumFreeze-Dry CycleC/T 4.8 sI1.80 d3Low-RH <10% DryNitrogen RoomC/T 6.1 sI0.80 d4Metal Screen &Rotary PouchC/T 4.1 sI1.20 d5O2-ScavengerInsert & CaseC/T 3.3 sI1.80 dCUSTOMERSnacking &Cereal…9,500 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Frozen Tray Load & Weight3.9 s25 min95%98.8%7,60010,450 (1.10 d)12,545
2. -45°C Vacuum Freeze-Dry Cycle4.8 s40 min90%97.5%7,60012,350 (1.30 d)9,323
3. Low-RH <10% Dry Nitrogen Room6.1 s55 min84%96.2%9,50017,100 (1.80 d)6,716
4. Metal Screen & Rotary Pouch4.1 s8 min96%98.9%2,8507,600 (0.80 d)12,134
5. O2-Scavenger Insert & Case3.3 s10 min97%99.4%2,85011,400 (1.20 d)15,193

Key figures

Takt time
5.7 s
Lead time
8.00 d
Value-added time
22.2 s
Process cycle efficiency (PCE)
0.005%
Rolled throughput yield (RTY)
91.1%
Customer demand per day
9,500 packs
Line capacity per day
6,716 packs
Bottleneck
Low-RH <10% Dry Nitrogen Room

Reading the bottleneck

The bottleneck is "Low-RH <10% Dry Nitrogen Room": it can process 6,716 packs per day against a demand of 9,500 packs, so it falls short of demand by 29.3%. Once downtime and scrap are counted, its cycle time grows from 6.1 s to 7.5 s, against a takt of 5.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.