High-Throughput Clinical Pathology Lab
Product family: Blood & Molecular Diagnostic Tubes.
Flow: Diagnostic Reagent Suppliers → Accessioning & Barcode → Centrifugation & Decap → PCR & Core Analyzers → Pathologist Validation → HL7 EHR Release → Wards & Outpatient Clinics
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Accessioning & Barcode | 14.4 s | 5 min | 97% | 98.2% | 675 | 1,575 (0.70 d) | 3,506 |
| 2. Centrifugation & Decap | 18.7 s | 10 min | 93% | 98.5% | 675 | 2,250 (1.00 d) | 2,547 |
| 3. PCR & Core Analyzers | 25.4 s | 20 min | 84% | 94.0% | 900 | 3,150 (1.40 d) | 1,585 |
| 4. Pathologist Validation | 18.2 s | 3 min | 96% | 98.8% | 450 | 1,350 (0.60 d) | 2,767 |
| 5. HL7 EHR Release | 11.5 s | 2 min | 99% | 99.6% | 225 | 675 (0.30 d) | 4,527 |
Key figures
- Takt time
- 24.0 s
- Lead time
- 4.40 d
- Value-added time
- 88.2 s
- Process cycle efficiency (PCE)
- 0.037%
- Rolled throughput yield (RTY)
- 89.5%
- Customer demand per day
- 2,250 samples
- Line capacity per day
- 1,585 samples
- Bottleneck
- PCR & Core Analyzers
Reading the bottleneck
The bottleneck is "PCR & Core Analyzers": it can process 1,585 samples per day against a demand of 2,250 samples, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 25.4 s to 32.2 s, against a takt of 24.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 4.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Clinical Labs, Imaging & Pathology: Clinical Labs, Imaging & Pathology
- Cancer Tissue Biopsy Histopathology & Stain Lab
- Hospital Blood Transfusion Cross-Match Issue
- MALDI-TOF Rapid Sepsis & Culture Lab
- 3T Outpatient MRI Diagnostic Imaging Flow
- Clinical Whole-Exome DNA Sequencing (NGS) Lab
- F18-FDG Nuclear Medicine PET-CT Cancer Scan
- IVF Fertility Clinic Embryology & Blastocyst Flow
- Forensic LC-MS/MS Drug & Toxicology Screening
- Digital Intraoral Scan-to-Zirconia Crown Lab
- Mobile Breast Screening Mammography Bus Loop
- In-Clinic & Home Polysomnography Sleep Study