Hospital Blood Transfusion Cross-Match Issue
Product family: Type-Screen & RBC Release.
Flow: Blood Component Stock → Dual-Verify Tube & ABO Gel → Antibody Screen Column Test → Electronic / Serology Cross → Blood Fridge Barcode Issue → Pneumatic Tube STAT OR Drop → Operating Rooms & Trauma
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Dual-Verify Tube & ABO Gel | 270 s | 5 min | 97% | 98.2% | 54 | 126 (0.70 d) | 282 |
| 2. Antibody Screen Column Test | 351 s | 10 min | 93% | 98.5% | 54 | 180 (1.00 d) | 206 |
| 3. Electronic / Serology Cross | 477 s | 20 min | 84% | 94.0% | 72 | 252 (1.40 d) | 129 |
| 4. Blood Fridge Barcode Issue | 342 s | 3 min | 96% | 98.8% | 36 | 108 (0.60 d) | 222 |
| 5. Pneumatic Tube STAT OR Drop | 216 s | 2 min | 99% | 99.6% | 18 | 54 (0.30 d) | 364 |
Key figures
- Takt time
- 450 s
- Lead time
- 4.42 d
- Value-added time
- 1,656 s
- Process cycle efficiency (PCE)
- 0.46%
- Rolled throughput yield (RTY)
- 89.5%
- Customer demand per day
- 180 samples
- Line capacity per day
- 129 samples
- Bottleneck
- Electronic / Serology Cross
Reading the bottleneck
The bottleneck is "Electronic / Serology Cross": it can process 129 samples per day against a demand of 180 samples, so it falls short of demand by 28.3%. Once downtime and scrap are counted, its cycle time grows from 477 s to 604 s, against a takt of 450 s. The largest loss at this step is equipment downtime (uptime 84%), about 90.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Clinical Labs, Imaging & Pathology: Clinical Labs, Imaging & Pathology
- High-Throughput Clinical Pathology Lab
- Cancer Tissue Biopsy Histopathology & Stain Lab
- MALDI-TOF Rapid Sepsis & Culture Lab
- 3T Outpatient MRI Diagnostic Imaging Flow
- Clinical Whole-Exome DNA Sequencing (NGS) Lab
- F18-FDG Nuclear Medicine PET-CT Cancer Scan
- IVF Fertility Clinic Embryology & Blastocyst Flow
- Forensic LC-MS/MS Drug & Toxicology Screening
- Digital Intraoral Scan-to-Zirconia Crown Lab
- Mobile Breast Screening Mammography Bus Loop
- In-Clinic & Home Polysomnography Sleep Study