Clinical Whole-Exome DNA Sequencing (NGS) Lab

Product family: Precision Oncology Genomics.

Flow: High-Throughput Sequencing Reagents → Automated DNA/RNA Extract → Library Prep & Hybrid Capture → Flow-Cell Clustering → Cloud Bioinformatics Pipeline → Molecular Pathologist Sign → Oncology Genomic Clinics

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Clinical Whole-Exome DNA Sequencing (NGS) LabSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. High-Throughput Sequencing Reagents → Automated DNA/RNA Extract (341 s) → Library Prep & Hybrid Capture (443 s) → Flow-Cell Clustering (603 s) → Cloud Bioinformatics Pipeline (432 s) → Molecular Pathologist Sign (273 s) → Oncology Genomic Clinics.SUPPLIERHigh-ThroughputSequencingReagentsI0.71 d1Automated DNA/RNAExtractC/T 341 sI1.00 d2Library Prep &Hybrid CaptureC/T 443 sI1.40 d3Flow-CellClusteringC/T 603 sI0.60 d4CloudBioinformatics…C/T 432 sI0.31 d5MolecularPathologist SignC/T 273 sI0.40 dCUSTOMEROncologyGenomic Clinics95 / samples

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Automated DNA/RNA Extract341 s5 min97%98.2%2967 (0.71 d)148
2. Library Prep & Hybrid Capture443 s10 min93%98.5%2995 (1.00 d)108
3. Flow-Cell Clustering603 s20 min84%94.0%38133 (1.40 d)67
4. Cloud Bioinformatics Pipeline432 s3 min96%98.8%1957 (0.60 d)117
5. Molecular Pathologist Sign273 s2 min99%99.6%1029 (0.31 d)191

Key figures

Takt time
568 s
Lead time
4.45 d
Value-added time
2,092 s
Process cycle efficiency (PCE)
0.87%
Rolled throughput yield (RTY)
89.5%
Customer demand per day
95 samples
Line capacity per day
67 samples
Bottleneck
Flow-Cell Clustering

Reading the bottleneck

The bottleneck is "Flow-Cell Clustering": it can process 67 samples per day against a demand of 95 samples, so it falls short of demand by 29.7%. Once downtime and scrap are counted, its cycle time grows from 603 s to 764 s, against a takt of 568 s. The largest loss at this step is equipment downtime (uptime 84%), about 115 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.