IVF Fertility Clinic Embryology & Blastocyst Flow

Product family: Time-Lapse Embryo Transfer Lab.

Flow: Embryo Culture Media → Follicular Aspiration Tube Pass → ICSI Micromanipulation Dish → 5-Day Time-Lapse Incubator → Pre-Implant Biopsy / Freeze → RFID-Witnessed Embryo Transfer → Fertility Outpatients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: IVF Fertility Clinic Embryology & Blastocyst FlowSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Embryo Culture Media → Follicular Aspiration Tube Pass (900 s) → ICSI Micromanipulation Dish (1,170 s) → 5-Day Time-Lapse Incubator (1,590 s) → Pre-Implant Biopsy / Freeze (1,140 s) → RFID-Witnessed Embryo Transfer (720 s) → Fertility Outpatients.SUPPLIEREmbryo CultureMediaI0.72 d1FollicularAspiration Tube…C/T 900 sI1.00 d2ICSIMicromanipulatio…C/T 1,170 sI1.39 d35-Day Time-LapseIncubatorC/T 1,590 sI0.61 d4Pre-ImplantBiopsy / FreezeC/T 1,140 sI0.28 d5RFID-WitnessedEmbryo TransferC/T 720 sI0.39 dCUSTOMERFertilityOutpatients18 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Follicular Aspiration Tube Pass900 s5 min97%98.2%513 (0.72 d)27
2. ICSI Micromanipulation Dish1,170 s10 min93%98.5%518 (1.00 d)19
3. 5-Day Time-Lapse Incubator1,590 s20 min84%94.0%725 (1.39 d)12
4. Pre-Implant Biopsy / Freeze1,140 s3 min96%98.8%411 (0.61 d)22
5. RFID-Witnessed Embryo Transfer720 s2 min99%99.6%25 (0.28 d)35

Key figures

Takt time
1,500 s
Lead time
4.59 d
Value-added time
5,520 s
Process cycle efficiency (PCE)
4.5%
Rolled throughput yield (RTY)
89.5%
Customer demand per day
18 patients
Line capacity per day
12 patients
Bottleneck
5-Day Time-Lapse Incubator

Reading the bottleneck

The bottleneck is "5-Day Time-Lapse Incubator": it can process 12 patients per day against a demand of 18 patients, so it falls short of demand by 34.0%. Once downtime and scrap are counted, its cycle time grows from 1,590 s to 2,014 s, against a takt of 1,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 303 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.