F18-FDG Nuclear Medicine PET-CT Cancer Scan

Product family: Half-Life Timed Isotope Flow.

Flow: Cyclotron Isotope Courier → Glucose Check & Lead Dose Assay → 60-Min Quiet Uptake Booth → 20-Min Whole-Body PET-CT Scan → SUV Quant Reconstruction → Nuclear Physician PACS Read → Oncology Staging Boards

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: F18-FDG Nuclear Medicine PET-CT Cancer ScanSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cyclotron Isotope Courier → Glucose Check & Lead Dose Assay (623 s) → 60-Min Quiet Uptake Booth (810 s) → 20-Min Whole-Body PET-CT Scan (1,101 s) → SUV Quant Reconstruction (789 s) → Nuclear Physician PACS Read (498 s) → Oncology Staging Boards.SUPPLIERCyclotronIsotope CourierI0.69 d1Glucose Check &Lead Dose AssayC/T 623 sI1.00 d260-Min QuietUptake BoothC/T 810 sI1.38 d320-Min Whole-BodyPET-CT ScanC/T 1,101 sI0.62 d4SUV QuantReconstructionC/T 789 sI0.31 d5Nuclear PhysicianPACS ReadC/T 498 sI0.38 dCUSTOMEROncologyStaging Boards26 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Glucose Check & Lead Dose Assay623 s5 min97%98.2%818 (0.69 d)40
2. 60-Min Quiet Uptake Booth810 s10 min93%98.5%826 (1.00 d)28
3. 20-Min Whole-Body PET-CT Scan1,101 s20 min84%94.0%1036 (1.38 d)17
4. SUV Quant Reconstruction789 s3 min96%98.8%516 (0.62 d)31
5. Nuclear Physician PACS Read498 s2 min99%99.6%38 (0.31 d)51

Key figures

Takt time
1,038 s
Lead time
4.53 d
Value-added time
3,821 s
Process cycle efficiency (PCE)
3.1%
Rolled throughput yield (RTY)
89.5%
Customer demand per day
26 patients
Line capacity per day
17 patients
Bottleneck
20-Min Whole-Body PET-CT Scan

Reading the bottleneck

The bottleneck is "20-Min Whole-Body PET-CT Scan": it can process 17 patients per day against a demand of 26 patients, so it falls short of demand by 34.1%. Once downtime and scrap are counted, its cycle time grows from 1,101 s to 1,394 s, against a takt of 1,038 s. The largest loss at this step is equipment downtime (uptime 84%), about 210 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.