3T Outpatient MRI Diagnostic Imaging Flow
Product family: 30-Min Zero-Idle Magnet Slots.
Flow: Contrast & Coil Clean Kits → Safety Metal Screen Pre-Call → Contrast IV Prep in Sub-Wait → Dual-Table Dock 3T Magnet Scan → PACS Tech Recon & Coil Wipe → Teleradiology Report <4h → Referring Specialists & PACS
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Safety Metal Screen Pre-Call | 771 s | 5 min | 97% | 98.2% | 13 | 29 (0.69 d) | 66 |
| 2. Contrast IV Prep in Sub-Wait | 1,003 s | 10 min | 93% | 98.5% | 13 | 42 (1.00 d) | 48 |
| 3. Dual-Table Dock 3T Magnet Scan | 1,363 s | 20 min | 84% | 94.0% | 17 | 59 (1.40 d) | 30 |
| 4. PACS Tech Recon & Coil Wipe | 977 s | 3 min | 96% | 98.8% | 8 | 25 (0.60 d) | 52 |
| 5. Teleradiology Report <4h | 617 s | 2 min | 99% | 99.6% | 4 | 13 (0.31 d) | 84 |
Key figures
- Takt time
- 1,286 s
- Lead time
- 4.49 d
- Value-added time
- 4,731 s
- Process cycle efficiency (PCE)
- 2.0%
- Rolled throughput yield (RTY)
- 89.5%
- Customer demand per day
- 42 patients
- Line capacity per day
- 30 patients
- Bottleneck
- Dual-Table Dock 3T Magnet Scan
Reading the bottleneck
The bottleneck is "Dual-Table Dock 3T Magnet Scan": it can process 30 patients per day against a demand of 42 patients, so it falls short of demand by 29.6%. Once downtime and scrap are counted, its cycle time grows from 1,363 s to 1,726 s, against a takt of 1,286 s. The largest loss at this step is equipment downtime (uptime 84%), about 260 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Clinical Labs, Imaging & Pathology: Clinical Labs, Imaging & Pathology
- High-Throughput Clinical Pathology Lab
- Cancer Tissue Biopsy Histopathology & Stain Lab
- Hospital Blood Transfusion Cross-Match Issue
- MALDI-TOF Rapid Sepsis & Culture Lab
- Clinical Whole-Exome DNA Sequencing (NGS) Lab
- F18-FDG Nuclear Medicine PET-CT Cancer Scan
- IVF Fertility Clinic Embryology & Blastocyst Flow
- Forensic LC-MS/MS Drug & Toxicology Screening
- Digital Intraoral Scan-to-Zirconia Crown Lab
- Mobile Breast Screening Mammography Bus Loop
- In-Clinic & Home Polysomnography Sleep Study