Mobile Breast Screening Mammography Bus Loop
Product family: Zero-Recall Tomosynthesis.
Flow: 3D Tomo Paddles & Wipes → QR Check-In & History Tablet → Private Changing Gown Pod → 4-View 3D Tomosynthesis → AI Triage Double-Read PACS → SMS Normal Result Within 24h → National Cancer Screening
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. QR Check-In & History Tablet | 295 s | 5 min | 97% | 98.2% | 17 | 39 (0.71 d) | 84 |
| 2. Private Changing Gown Pod | 383 s | 10 min | 93% | 98.5% | 17 | 55 (1.00 d) | 60 |
| 3. 4-View 3D Tomosynthesis | 520 s | 20 min | 84% | 94.0% | 22 | 77 (1.40 d) | 36 |
| 4. AI Triage Double-Read PACS | 373 s | 3 min | 96% | 98.8% | 11 | 33 (0.60 d) | 66 |
| 5. SMS Normal Result Within 24h | 236 s | 2 min | 99% | 99.6% | 6 | 17 (0.31 d) | 108 |
Key figures
- Takt time
- 491 s
- Lead time
- 4.49 d
- Value-added time
- 1,807 s
- Process cycle efficiency (PCE)
- 1.5%
- Rolled throughput yield (RTY)
- 89.5%
- Customer demand per day
- 55 patients
- Line capacity per day
- 36 patients
- Bottleneck
- 4-View 3D Tomosynthesis
Reading the bottleneck
The bottleneck is "4-View 3D Tomosynthesis": it can process 36 patients per day against a demand of 55 patients, so it falls short of demand by 33.7%. Once downtime and scrap are counted, its cycle time grows from 520 s to 659 s, against a takt of 491 s. The largest loss at this step is equipment downtime (uptime 84%), about 99.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Clinical Labs, Imaging & Pathology: Clinical Labs, Imaging & Pathology
- High-Throughput Clinical Pathology Lab
- Cancer Tissue Biopsy Histopathology & Stain Lab
- Hospital Blood Transfusion Cross-Match Issue
- MALDI-TOF Rapid Sepsis & Culture Lab
- 3T Outpatient MRI Diagnostic Imaging Flow
- Clinical Whole-Exome DNA Sequencing (NGS) Lab
- F18-FDG Nuclear Medicine PET-CT Cancer Scan
- IVF Fertility Clinic Embryology & Blastocyst Flow
- Forensic LC-MS/MS Drug & Toxicology Screening
- Digital Intraoral Scan-to-Zirconia Crown Lab
- In-Clinic & Home Polysomnography Sleep Study