Digital Intraoral Scan-to-Zirconia Crown Lab
Product family: 24-Hour Milled Ceramic Crowns.
Flow: Dental Zirconia Discs → Intraoral Scanner STL Import → CAD Margin & Occlusion Design → 5-Axis Wet/Dry Disc Mill → 1530°C 6-Hour Sintering Kiln → Hand Stain, Glaze & Courier → Dental Clinics Network
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Intraoral Scanner STL Import | 231 s | 5 min | 97% | 98.2% | 42 | 98 (0.70 d) | 219 |
| 2. CAD Margin & Occlusion Design | 301 s | 10 min | 93% | 98.5% | 42 | 140 (1.00 d) | 158 |
| 3. 5-Axis Wet/Dry Disc Mill | 409 s | 20 min | 84% | 94.0% | 56 | 196 (1.40 d) | 98 |
| 4. 1530°C 6-Hour Sintering Kiln | 293 s | 3 min | 96% | 98.8% | 28 | 84 (0.60 d) | 172 |
| 5. Hand Stain, Glaze & Courier | 185 s | 2 min | 99% | 99.6% | 14 | 42 (0.30 d) | 281 |
Key figures
- Takt time
- 386 s
- Lead time
- 4.43 d
- Value-added time
- 1,419 s
- Process cycle efficiency (PCE)
- 0.59%
- Rolled throughput yield (RTY)
- 89.5%
- Customer demand per day
- 140 units
- Line capacity per day
- 98 units
- Bottleneck
- 5-Axis Wet/Dry Disc Mill
Reading the bottleneck
The bottleneck is "5-Axis Wet/Dry Disc Mill": it can process 98 units per day against a demand of 140 units, so it falls short of demand by 29.7%. Once downtime and scrap are counted, its cycle time grows from 409 s to 518 s, against a takt of 386 s. The largest loss at this step is equipment downtime (uptime 84%), about 77.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Clinical Labs, Imaging & Pathology: Clinical Labs, Imaging & Pathology
- High-Throughput Clinical Pathology Lab
- Cancer Tissue Biopsy Histopathology & Stain Lab
- Hospital Blood Transfusion Cross-Match Issue
- MALDI-TOF Rapid Sepsis & Culture Lab
- 3T Outpatient MRI Diagnostic Imaging Flow
- Clinical Whole-Exome DNA Sequencing (NGS) Lab
- F18-FDG Nuclear Medicine PET-CT Cancer Scan
- IVF Fertility Clinic Embryology & Blastocyst Flow
- Forensic LC-MS/MS Drug & Toxicology Screening
- Mobile Breast Screening Mammography Bus Loop
- In-Clinic & Home Polysomnography Sleep Study