Cancer Tissue Biopsy Histopathology & Stain Lab
Product family: Formalin-to-Slide Pathologist.
Flow: OR Surgical Biopsy Cassettes → Grossing Dissection & Cassette → Overnight Tissue Processor → Microtome 4um Wax Ribbon Cut → H&E / IHC Auto-Stain & Scan → Digital Whole-Slide Diagnosis → Oncology Tumor Boards
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Grossing Dissection & Cassette | 38.6 s | 5 min | 97% | 98.2% | 126 | 294 (0.70 d) | 642 |
| 2. Overnight Tissue Processor | 50.0 s | 10 min | 93% | 98.5% | 126 | 420 (1.00 d) | 458 |
| 3. Microtome 4um Wax Ribbon Cut | 68.0 s | 20 min | 84% | 94.0% | 168 | 588 (1.40 d) | 279 |
| 4. H&E / IHC Auto-Stain & Scan | 49.0 s | 3 min | 96% | 98.8% | 84 | 252 (0.60 d) | 505 |
| 5. Digital Whole-Slide Diagnosis | 30.9 s | 2 min | 99% | 99.6% | 42 | 126 (0.30 d) | 823 |
Key figures
- Takt time
- 64.3 s
- Lead time
- 4.41 d
- Value-added time
- 237 s
- Process cycle efficiency (PCE)
- 0.20%
- Rolled throughput yield (RTY)
- 89.5%
- Customer demand per day
- 420 samples
- Line capacity per day
- 279 samples
- Bottleneck
- Microtome 4um Wax Ribbon Cut
Reading the bottleneck
The bottleneck is "Microtome 4um Wax Ribbon Cut": it can process 279 samples per day against a demand of 420 samples, so it falls short of demand by 33.6%. Once downtime and scrap are counted, its cycle time grows from 68.0 s to 86.1 s, against a takt of 64.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 13.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Clinical Labs, Imaging & Pathology: Clinical Labs, Imaging & Pathology
- High-Throughput Clinical Pathology Lab
- Hospital Blood Transfusion Cross-Match Issue
- MALDI-TOF Rapid Sepsis & Culture Lab
- 3T Outpatient MRI Diagnostic Imaging Flow
- Clinical Whole-Exome DNA Sequencing (NGS) Lab
- F18-FDG Nuclear Medicine PET-CT Cancer Scan
- IVF Fertility Clinic Embryology & Blastocyst Flow
- Forensic LC-MS/MS Drug & Toxicology Screening
- Digital Intraoral Scan-to-Zirconia Crown Lab
- Mobile Breast Screening Mammography Bus Loop
- In-Clinic & Home Polysomnography Sleep Study