MALDI-TOF Rapid Sepsis & Culture Lab

Product family: Blood Culture Identification.

Flow: Culture Plates & Broth → Automated Plate Streaker Inoc → Smart Incubator Time-Lapse Cam → MALDI-TOF Laser ID <5 Min → Rapid AST Antibiotic MIC → Alert Antimicrobial Steward → Hospital Infectious Control

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: MALDI-TOF Rapid Sepsis & Culture LabSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Culture Plates & Broth → Automated Plate Streaker Inoc (48.0 s) → Smart Incubator Time-Lapse Cam (62.0 s) → MALDI-TOF Laser ID <5 Min (84.0 s) → Rapid AST Antibiotic MIC (60.0 s) → Alert Antimicrobial Steward (38.1 s) → Hospital Infectious Control.SUPPLIERCulture Plates& BrothI0.70 d1Automated PlateStreaker InocC/T 48.0 sI1.00 d2Smart IncubatorTime-Lapse CamC/T 62.0 sI1.40 d3MALDI-TOF LaserID <5 MinC/T 84.0 sI0.60 d4Rapid ASTAntibiotic MICC/T 60.0 sI0.30 d5AlertAntimicrobial…C/T 38.1 sI0.40 dCUSTOMERHospitalInfectious…680 / samples

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Automated Plate Streaker Inoc48.0 s5 min97%98.2%204476 (0.70 d)1,052
2. Smart Incubator Time-Lapse Cam62.0 s10 min93%98.5%204680 (1.00 d)768
3. MALDI-TOF Laser ID <5 Min84.0 s20 min84%94.0%272952 (1.40 d)479
4. Rapid AST Antibiotic MIC60.0 s3 min96%98.8%136408 (0.60 d)839
5. Alert Antimicrobial Steward38.1 s2 min99%99.6%68204 (0.30 d)1,366

Key figures

Takt time
79.4 s
Lead time
4.41 d
Value-added time
292 s
Process cycle efficiency (PCE)
0.12%
Rolled throughput yield (RTY)
89.5%
Customer demand per day
680 samples
Line capacity per day
479 samples
Bottleneck
MALDI-TOF Laser ID <5 Min

Reading the bottleneck

The bottleneck is "MALDI-TOF Laser ID <5 Min": it can process 479 samples per day against a demand of 680 samples, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 84.0 s to 106 s, against a takt of 79.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 16.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Clinical Labs, Imaging & Pathology: Clinical Labs, Imaging & Pathology