Forensic LC-MS/MS Drug & Toxicology Screening

Product family: Chain-of-Custody Legal Lab.

Flow: Deuterated Internal Standards → Tamper Seal Custody Intake → Robotic SPE Extraction Prep → High-Res LC-MS/MS Quant Run → Dual Toxicologist Blind Review → Court-Certified Hash Report → Courts & Sports Anti-Doping

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Forensic LC-MS/MS Drug & Toxicology ScreeningSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Deuterated Internal Standards → Tamper Seal Custody Intake (51.0 s) → Robotic SPE Extraction Prep (66.0 s) → High-Res LC-MS/MS Quant Run (89.0 s) → Dual Toxicologist Blind Review (64.0 s) → Court-Certified Hash Report (41.0 s) → Courts & Sports Anti-Doping.SUPPLIERDeuteratedInternalStandardsI0.70 d1Tamper SealCustody IntakeC/T 51.0 sI1.00 d2Robotic SPEExtraction PrepC/T 66.0 sI1.40 d3High-Res LC-MS/MSQuant RunC/T 89.0 sI0.60 d4Dual ToxicologistBlind ReviewC/T 64.0 sI0.30 d5Court-CertifiedHash ReportC/T 41.0 sI0.40 dCUSTOMERCourts & SportsAnti-Doping320 / samples

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Tamper Seal Custody Intake51.0 s5 min97%98.2%96224 (0.70 d)486
2. Robotic SPE Extraction Prep66.0 s10 min93%98.5%96320 (1.00 d)347
3. High-Res LC-MS/MS Quant Run89.0 s20 min84%94.0%128448 (1.40 d)213
4. Dual Toxicologist Blind Review64.0 s3 min96%98.8%64192 (0.60 d)387
5. Court-Certified Hash Report41.0 s2 min99%99.6%3296 (0.30 d)620

Key figures

Takt time
84.4 s
Lead time
4.41 d
Value-added time
311 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
89.5%
Customer demand per day
320 samples
Line capacity per day
213 samples
Bottleneck
High-Res LC-MS/MS Quant Run

Reading the bottleneck

The bottleneck is "High-Res LC-MS/MS Quant Run": it can process 213 samples per day against a demand of 320 samples, so it falls short of demand by 33.5%. Once downtime and scrap are counted, its cycle time grows from 89.0 s to 113 s, against a takt of 84.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 17.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.