Hearing Loss Audiogram & Real-Ear Aid Fitting

Product family: Precision Acoustic Tuning.

Flow: Custom Ear Molds & Chargers → Otoscope Wax Clear & Video → Soundproof Pure-Tone Speech → 3D Silicone Ear Canal Scan → Real-Ear Probe Mic Mapping → Bluetooth App Pair & Warranty → Senior Hearing Clinics

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hearing Loss Audiogram & Real-Ear Aid FittingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Custom Ear Molds & Chargers → Otoscope Wax Clear & Video (559 s) → Soundproof Pure-Tone Speech (771 s) → 3D Silicone Ear Canal Scan (1,032 s) → Real-Ear Probe Mic Mapping (714 s) → Bluetooth App Pair & Warranty (482 s) → Senior Hearing Clinics.SUPPLIERCustom EarMolds &ChargersI0.61 d1Otoscope WaxClear & VideoC/T 559 sI0.71 d2SoundproofPure-Tone SpeechC/T 771 sI1.11 d33D Silicone EarCanal ScanC/T 1,032 sI0.50 d4Real-Ear ProbeMic MappingC/T 714 sI0.29 d5Bluetooth AppPair & WarrantyC/T 482 sI0.21 dCUSTOMERSenior HearingClinics28 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Otoscope Wax Clear & Video559 s4 min97%96.5%617 (0.61 d)43
2. Soundproof Pure-Tone Speech771 s6 min94%97.6%420 (0.71 d)29
3. 3D Silicone Ear Canal Scan1,032 s10 min86%94.5%431 (1.11 d)18
4. Real-Ear Probe Mic Mapping714 s5 min95%98.4%314 (0.50 d)32
5. Bluetooth App Pair & Warranty482 s3 min98%99.2%38 (0.29 d)51

Key figures

Takt time
964 s
Lead time
3.56 d
Value-added time
3,558 s
Process cycle efficiency (PCE)
3.7%
Rolled throughput yield (RTY)
86.9%
Customer demand per day
28 patients
Line capacity per day
18 patients
Bottleneck
3D Silicone Ear Canal Scan

Reading the bottleneck

The bottleneck is "3D Silicone Ear Canal Scan": it can process 18 patients per day against a demand of 28 patients, so it falls short of demand by 35.9%. Once downtime and scrap are counted, its cycle time grows from 1,032 s to 1,270 s, against a takt of 964 s. The largest loss at this step is equipment downtime (uptime 86%), about 168 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.