Visiting Home Health Nurse & Wound Route

Product family: 6-Patient Daily Neighborhood Loop.

Flow: Central Wound Pack Supply → Route Sequence Morning Pack → Home Safety & Vitals Tablet → Sterile Negative-Press Wound → MD Tele-Consult Escalate Photo → Evening Sync & Next-Day Prep → Homebound Seniors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Visiting Home Health Nurse & Wound RouteSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Central Wound Pack Supply → Route Sequence Morning Pack (174 s) → Home Safety & Vitals Tablet (240 s) → Sterile Negative-Press Wound (321 s) → MD Tele-Consult Escalate Photo (222 s) → Evening Sync & Next-Day Prep (150 s) → Homebound Seniors.SUPPLIERCentral WoundPack SupplyI0.60 d1Route SequenceMorning PackC/T 174 sI0.70 d2Home Safety &Vitals TabletC/T 240 sI1.10 d3SterileNegative-Press…C/T 321 sI0.50 d4MD Tele-ConsultEscalate PhotoC/T 222 sI0.30 d5Evening Sync &Next-Day PrepC/T 150 sI0.20 dCUSTOMERHomeboundSeniors90 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Route Sequence Morning Pack174 s4 min97%96.5%1854 (0.60 d)139
2. Home Safety & Vitals Tablet240 s6 min94%97.6%1463 (0.70 d)94
3. Sterile Negative-Press Wound321 s10 min86%94.5%1499 (1.10 d)59
4. MD Tele-Consult Escalate Photo222 s5 min95%98.4%945 (0.50 d)101
5. Evening Sync & Next-Day Prep150 s3 min98%99.2%927 (0.30 d)163

Key figures

Takt time
300 s
Lead time
3.44 d
Value-added time
1,107 s
Process cycle efficiency (PCE)
1.2%
Rolled throughput yield (RTY)
86.9%
Customer demand per day
90 patients
Line capacity per day
59 patients
Bottleneck
Sterile Negative-Press Wound

Reading the bottleneck

The bottleneck is "Sterile Negative-Press Wound": it can process 59 patients per day against a demand of 90 patients, so it falls short of demand by 34.9%. Once downtime and scrap are counted, its cycle time grows from 321 s to 395 s, against a takt of 300 s. The largest loss at this step is equipment downtime (uptime 86%), about 52.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.