Small Animal Companion Vet Surgery & Dental Flow
Product family: Fear-Free Vet Clinic Circuit.
Flow: Animal Health Lab & Vet Pharma → Separate Cat/Dog Check-In → Pre-Op Blood Chem Analyzer → Ultrasound Dental / Spay Suite → Warm Incubator Recovery Cages → Discharge Video & Meds Pack → Pet Owners
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Separate Cat/Dog Check-In | 412 s | 4 min | 97% | 96.5% | 8 | 23 (0.61 d) | 59 |
| 2. Pre-Op Blood Chem Analyzer | 568 s | 6 min | 94% | 97.6% | 6 | 27 (0.71 d) | 40 |
| 3. Ultrasound Dental / Spay Suite | 760 s | 10 min | 86% | 94.5% | 6 | 42 (1.11 d) | 25 |
| 4. Warm Incubator Recovery Cages | 526 s | 5 min | 95% | 98.4% | 4 | 19 (0.50 d) | 43 |
| 5. Discharge Video & Meds Pack | 355 s | 3 min | 98% | 99.2% | 4 | 11 (0.29 d) | 69 |
Key figures
- Takt time
- 711 s
- Lead time
- 3.52 d
- Value-added time
- 2,621 s
- Process cycle efficiency (PCE)
- 2.8%
- Rolled throughput yield (RTY)
- 86.9%
- Customer demand per day
- 38 patients
- Line capacity per day
- 25 patients
- Bottleneck
- Ultrasound Dental / Spay Suite
Reading the bottleneck
The bottleneck is "Ultrasound Dental / Spay Suite": it can process 25 patients per day against a demand of 38 patients, so it falls short of demand by 34.7%. Once downtime and scrap are counted, its cycle time grows from 760 s to 935 s, against a takt of 711 s. The largest loss at this step is equipment downtime (uptime 86%), about 124 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Rehab, Screening & Outpatient Clinics: Rehab, Screening & Outpatient Clinics
- Musculoskeletal Sports Physio & ACL Return Clinic
- Executive 3-Hour Whole-Body Preventive Checkup
- Whole Blood & Apheresis Donor Center
- 24/7 Virtual Urgent Telemedicine Video Consult
- Custom 3D-Scanned Carbon-Fiber Leg Prosthetic
- Post-Hospital Skilled Nursing Home Transition
- Visiting Home Health Nurse & Wound Route
- Supervised Telemetry Phase-II Cardiac Rehab Pod
- Hearing Loss Audiogram & Real-Ear Aid Fitting
- Mass Seasonal Flu / COVID Drive-Up Vaccination
- All-Laser Femtosecond LASIK Eye Correction