Whole Blood & Apheresis Donor Center

Product family: 45-Min Comfortable Vein Loop.

Flow: Blood Bags & Snacks → QR Health Questionnaire → Fingerstick Hemoglobin Check → Vein Phlebotomy 450mL Draw → 15-Min Refreshment Recovery → 4°C Transport Cooler Load → Regional Blood Testing Hub

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Whole Blood & Apheresis Donor CenterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Blood Bags & Snacks → QR Health Questionnaire (112 s) → Fingerstick Hemoglobin Check (154 s) → Vein Phlebotomy 450mL Draw (206 s) → 15-Min Refreshment Recovery (143 s) → 4°C Transport Cooler Load (96.0 s) → Regional Blood Testing Hub.SUPPLIERBlood Bags &SnacksI0.60 d1QR HealthQuestionnaireC/T 112 sI0.70 d2FingerstickHemoglobin CheckC/T 154 sI1.10 d3Vein Phlebotomy450mL DrawC/T 206 sI0.50 d415-MinRefreshment…C/T 143 sI0.30 d54°C TransportCooler LoadC/T 96.0 sI0.20 dCUSTOMERRegional BloodTesting Hub140 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. QR Health Questionnaire112 s4 min97%96.5%2884 (0.60 d)216
2. Fingerstick Hemoglobin Check154 s6 min94%97.6%2198 (0.70 d)147
3. Vein Phlebotomy 450mL Draw206 s10 min86%94.5%21154 (1.10 d)91
4. 15-Min Refreshment Recovery143 s5 min95%98.4%1470 (0.50 d)157
5. 4°C Transport Cooler Load96.0 s3 min98%99.2%1442 (0.30 d)255

Key figures

Takt time
193 s
Lead time
3.43 d
Value-added time
711 s
Process cycle efficiency (PCE)
0.77%
Rolled throughput yield (RTY)
86.9%
Customer demand per day
140 patients
Line capacity per day
91 patients
Bottleneck
Vein Phlebotomy 450mL Draw

Reading the bottleneck

The bottleneck is "Vein Phlebotomy 450mL Draw": it can process 91 patients per day against a demand of 140 patients, so it falls short of demand by 35.2%. Once downtime and scrap are counted, its cycle time grows from 206 s to 253 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 86%), about 33.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.