Mass Seasonal Flu / COVID Drive-Up Vaccination

Product family: 120 Doses/Hr Pod Circuit.

Flow: Pre-Filled Cold Syringes → QR Appointment Scan-In Gate → Contraindication Screen Pod → Rapid Nurse Deltoid Jab & Lot → 15-Min Observation Timer Bay → Digital Certificate Auto-Push → Municipal Public Health

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Mass Seasonal Flu / COVID Drive-Up VaccinationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pre-Filled Cold Syringes → QR Appointment Scan-In Gate (24.1 s) → Contraindication Screen Pod (33.2 s) → Rapid Nurse Deltoid Jab & Lot (44.0 s) → 15-Min Observation Timer Bay (30.7 s) → Digital Certificate Auto-Push (20.8 s) → Municipal Public Health.SUPPLIERPre-Filled ColdSyringesI0.60 d1QR AppointmentScan-In GateC/T 24.1 sI0.70 d2ContraindicationScreen PodC/T 33.2 sI1.10 d3Rapid NurseDeltoid Jab & LotC/T 44.0 sI0.50 d415-MinObservation Time…C/T 30.7 sI0.30 d5DigitalCertificate…C/T 20.8 sI0.20 dCUSTOMERMunicipalPublic Health650 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. QR Appointment Scan-In Gate24.1 s4 min97%96.5%130390 (0.60 d)1,002
2. Contraindication Screen Pod33.2 s6 min94%97.6%98455 (0.70 d)680
3. Rapid Nurse Deltoid Jab & Lot44.0 s10 min86%94.5%98715 (1.10 d)425
4. 15-Min Observation Timer Bay30.7 s5 min95%98.4%65325 (0.50 d)731
5. Digital Certificate Auto-Push20.8 s3 min98%99.2%65195 (0.30 d)1,178

Key figures

Takt time
41.5 s
Lead time
3.41 d
Value-added time
153 s
Process cycle efficiency (PCE)
0.17%
Rolled throughput yield (RTY)
86.9%
Customer demand per day
650 patients
Line capacity per day
425 patients
Bottleneck
Rapid Nurse Deltoid Jab & Lot

Reading the bottleneck

The bottleneck is "Rapid Nurse Deltoid Jab & Lot": it can process 425 patients per day against a demand of 650 patients, so it falls short of demand by 34.6%. Once downtime and scrap are counted, its cycle time grows from 44.0 s to 54.1 s, against a takt of 41.5 s. The largest loss at this step is equipment downtime (uptime 86%), about 7.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.