24/7 Virtual Urgent Telemedicine Video Consult

Product family: Under-15 Min Digital Consult.

Flow: Pharmacy E-Script API → AI Symptom Bot Pre-Chart → Queue Wait Verification Match → HD Video Physician Consult → One-Click E-Rx to Pharmacy → Follow-Up Red-Flag SMS Check → Insured Members & Patients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 24/7 Virtual Urgent Telemedicine Video ConsultSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pharmacy E-Script API → AI Symptom Bot Pre-Chart (75.0 s) → Queue Wait Verification Match (103 s) → HD Video Physician Consult (138 s) → One-Click E-Rx to Pharmacy (95.0 s) → Follow-Up Red-Flag SMS Check (64.0 s) → Insured Members & Patients.SUPPLIERPharmacyE-Script APII0.60 d1AI Symptom BotPre-ChartC/T 75.0 sI0.70 d2Queue WaitVerification…C/T 103 sI1.10 d3HD VideoPhysician ConsultC/T 138 sI0.50 d4One-Click E-Rx toPharmacyC/T 95.0 sI0.30 d5Follow-UpRed-Flag SMS…C/T 64.0 sI0.20 dCUSTOMERInsured Members& Patients420 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. AI Symptom Bot Pre-Chart75.0 s4 min97%96.5%84252 (0.60 d)659
2. Queue Wait Verification Match103 s6 min94%97.6%63294 (0.70 d)460
3. HD Video Physician Consult138 s10 min86%94.5%63462 (1.10 d)294
4. One-Click E-Rx to Pharmacy95.0 s5 min95%98.4%42210 (0.50 d)502
5. Follow-Up Red-Flag SMS Check64.0 s3 min98%99.2%42126 (0.30 d)793

Key figures

Takt time
129 s
Lead time
3.41 d
Value-added time
475 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
86.9%
Customer demand per day
420 patients
Line capacity per day
294 patients
Bottleneck
HD Video Physician Consult

Reading the bottleneck

The bottleneck is "HD Video Physician Consult": it can process 294 patients per day against a demand of 420 patients, so it falls short of demand by 29.9%. Once downtime and scrap are counted, its cycle time grows from 138 s to 170 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 86%), about 22.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Rehab, Screening & Outpatient Clinics: Rehab, Screening & Outpatient Clinics