All-Laser Femtosecond LASIK Eye Correction
Product family: 15-Min Bilateral Refractive Loop.
Flow: Femtosecond Laser Sterile Cones → Corneal Topography Map Check → Numbing Drop & Relax Lounge → Femto Flap & Excimer Ablate → Dark Slit-Lamp Flap Verify → Protective Shields & Next-Day → Refractive Surgery Patients
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Corneal Topography Map Check | 489 s | 4 min | 97% | 96.5% | 6 | 19 (0.59 d) | 49 |
| 2. Numbing Drop & Relax Lounge | 675 s | 6 min | 94% | 97.6% | 5 | 22 (0.69 d) | 34 |
| 3. Femto Flap & Excimer Ablate | 903 s | 10 min | 86% | 94.5% | 5 | 35 (1.09 d) | 21 |
| 4. Dark Slit-Lamp Flap Verify | 624 s | 5 min | 95% | 98.4% | 3 | 16 (0.50 d) | 36 |
| 5. Protective Shields & Next-Day | 422 s | 3 min | 98% | 99.2% | 3 | 10 (0.31 d) | 58 |
Key figures
- Takt time
- 844 s
- Lead time
- 3.49 d
- Value-added time
- 3,113 s
- Process cycle efficiency (PCE)
- 3.3%
- Rolled throughput yield (RTY)
- 86.9%
- Customer demand per day
- 32 patients
- Line capacity per day
- 21 patients
- Bottleneck
- Femto Flap & Excimer Ablate
Reading the bottleneck
The bottleneck is "Femto Flap & Excimer Ablate": it can process 21 patients per day against a demand of 32 patients, so it falls short of demand by 34.9%. Once downtime and scrap are counted, its cycle time grows from 903 s to 1,111 s, against a takt of 844 s. The largest loss at this step is equipment downtime (uptime 86%), about 147 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Rehab, Screening & Outpatient Clinics: Rehab, Screening & Outpatient Clinics
- Musculoskeletal Sports Physio & ACL Return Clinic
- Executive 3-Hour Whole-Body Preventive Checkup
- Whole Blood & Apheresis Donor Center
- 24/7 Virtual Urgent Telemedicine Video Consult
- Custom 3D-Scanned Carbon-Fiber Leg Prosthetic
- Post-Hospital Skilled Nursing Home Transition
- Visiting Home Health Nurse & Wound Route
- Supervised Telemetry Phase-II Cardiac Rehab Pod
- Hearing Loss Audiogram & Real-Ear Aid Fitting
- Mass Seasonal Flu / COVID Drive-Up Vaccination
- Small Animal Companion Vet Surgery & Dental Flow