Custom 3D-Scanned Carbon-Fiber Leg Prosthetic

Product family: 2-Visit Gait Lab Fit Flow.

Flow: Titanium & Carbon Components → Optical 3D Limb Socket Scan → Thermoplastic Check Socket → Prepreg Carbon Socket Cure → Laser Alignment Dynamic Walk → Final Cosmetic & Gait Release → Amputee Mobility Clinics

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Custom 3D-Scanned Carbon-Fiber Leg ProstheticSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Titanium & Carbon Components → Optical 3D Limb Socket Scan (1,119 s) → Thermoplastic Check Socket (1,543 s) → Prepreg Carbon Socket Cure (2,064 s) → Laser Alignment Dynamic Walk (1,427 s) → Final Cosmetic & Gait Release (964 s) → Amputee Mobility Clinics.SUPPLIERTitanium &CarbonComponentsI0.57 d1Optical 3D LimbSocket ScanC/T 1,119 sI0.71 d2ThermoplasticCheck SocketC/T 1,543 sI1.07 d3Prepreg CarbonSocket CureC/T 2,064 sI0.50 d4Laser AlignmentDynamic WalkC/T 1,427 sI0.29 d5Final Cosmetic &Gait ReleaseC/T 964 sI0.21 dCUSTOMERAmputeeMobility…14 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Optical 3D Limb Socket Scan1,119 s4 min97%96.5%38 (0.57 d)22
2. Thermoplastic Check Socket1,543 s6 min94%97.6%210 (0.71 d)15
3. Prepreg Carbon Socket Cure2,064 s10 min86%94.5%215 (1.07 d)9
4. Laser Alignment Dynamic Walk1,427 s5 min95%98.4%17 (0.50 d)17
5. Final Cosmetic & Gait Release964 s3 min98%99.2%14 (0.29 d)27

Key figures

Takt time
1,929 s
Lead time
3.62 d
Value-added time
7,117 s
Process cycle efficiency (PCE)
7.3%
Rolled throughput yield (RTY)
86.9%
Customer demand per day
14 units
Line capacity per day
9 units
Bottleneck
Prepreg Carbon Socket Cure

Reading the bottleneck

The bottleneck is "Prepreg Carbon Socket Cure": it can process 9 units per day against a demand of 14 units, so it falls short of demand by 35.9%. Once downtime and scrap are counted, its cycle time grows from 2,064 s to 2,540 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 86%), about 336 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Rehab, Screening & Outpatient Clinics: Rehab, Screening & Outpatient Clinics