Bearings, Gears & Precision Fasteners VSM Scenarios

12 scenarios of Bearings, Gears & Precision Fasteners, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Multi-Station Cold Heading → Thread Roll & Gear Hob → Vacuum Heat Treat & Superfinish → Passivate & Hydrogen De-Embr → Eddy-Current & Cartoning. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
Case-Hardened Automotive Tapered Roller Bearing4,200 units per day319.3 s10.7 d0.009%CBN Cup & Cone Superfinish
Nickel-Alloy 718 High-Temp 12-Point Aero Bolt3,600 parts per day215.0 s10.7 d0.010%Radiused Fillet Cold-Roll Thread
5-Flute AlTiN Coated Solid Carbide Endmill2,800 parts per day328.9 s10.7 d0.013%5-Axis Helical Flute Grind
Pre-Loaded C3 Precision Ground Ball Screw320 units per day2169 s10.7 d0.12%Ball Nut Internal Pitch Grind
Induction-Hardened 4-Cyl Forged Crankshaft480 parts per day2113 s10.7 d0.077%Pin & Main Induction Harden
Hot-Forged Lead-Free Brass Radiant Manifold950 units per day256.8 s10.7 d0.039%Shot-Blast & Nickel Flash
Sub-Millimeter Titanium Orthopedic Bone Screw5,200 parts per day315.6 s10.7 d0.007%Ultrasonic Degrease & Passiv
Powder-Metal Sintered Variable Cam Phaser Rotor4,600 parts per day317.6 s10.7 d0.008%CNC Sizing Coining & Steam
Parabolic Taper-Rolled Truck Suspension Leaf640 parts per day284.4 s10.7 d0.058%Austenitize Form & Oil Quench
Precision ANSI/DIN Heavy Conveyor Roller Chain1,800 meters per day230.0 s10.7 d0.021%Bushing Seam & Solid Roll
ASME B16.5 Forged 316L Weld-Neck Pipe Flange750 parts per day272.0 s10.7 d0.049%Multi-Spindle Bolt-Hole Drill
Active Magnetic Bearing Turbo-Expander Cartridge22 units per day11,227 s10.9 d1.6%Vacuum Potting Epoxy Bake