Pre-Loaded C3 Precision Ground Ball Screw

Product family: CNC Feed Drive Ball Screws.

Flow: Bearing-steel bar supplier → Induction Thread Core Harden → Laser-Guided Thread Grinding → Ball Nut Internal Pitch Grind → Selective Steel Ball Match → Laser Pitch Error Mapping → Machine Tool & Robotics OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Pre-Loaded C3 Precision Ground Ball ScrewSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Bearing-steel bar supplier → Induction Thread Core Harden (122 s) → Laser-Guided Thread Grinding (142 s) → Ball Nut Internal Pitch Grind (181 s) → Selective Steel Ball Match (128 s) → Laser Pitch Error Mapping (95.0 s) → Machine Tool & Robotics OEMs.SUPPLIERBearing-steelbar supplierI2.20 d1Induction ThreadCore HardenC/T 122 sI1.80 d2Laser-GuidedThread GrindingC/T 142 sI2.40 d3Ball Nut InternalPitch GrindC/T 181 sI1.50 d4Selective SteelBall MatchC/T 128 sI0.80 d5Laser Pitch ErrorMappingC/T 95.0 sI2.00 dCUSTOMERMachine Tool &Robotics OEMs320 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Induction Thread Core Harden122 s65 min90%98.8%640704 (2.20 d)379
2. Laser-Guided Thread Grinding142 s45 min91%97.6%480576 (1.80 d)326
3. Ball Nut Internal Pitch Grind181 s50 min84%96.1%480768 (2.40 d)232
4. Selective Steel Ball Match128 s20 min93%98.4%320480 (1.50 d)377
5. Laser Pitch Error Mapping95.0 s12 min97%99.6%160256 (0.80 d)535

Key figures

Takt time
169 s
Lead time
10.7 d
Value-added time
668 s
Process cycle efficiency (PCE)
0.12%
Rolled throughput yield (RTY)
90.8%
Customer demand per day
320 units
Line capacity per day
232 units
Bottleneck
Ball Nut Internal Pitch Grind

Reading the bottleneck

The bottleneck is "Ball Nut Internal Pitch Grind": it can process 232 units per day against a demand of 320 units, so it falls short of demand by 27.5%. Once downtime and scrap are counted, its cycle time grows from 181 s to 224 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 84%), about 34.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.