Induction-Hardened 4-Cyl Forged Crankshaft
Product family: Micro-Alloy Diesel Crankshafts.
Flow: Crankshaft forge → Milling Mass-Center Datum → Turn-Broach Main Journals → Pin & Main Induction Harden → CBN Orbital Crankpin Grind → Superfinish Belt & Mag-Check → Commercial Diesel Engines
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Milling Mass-Center Datum | 81.0 s | 65 min | 90% | 98.8% | 960 | 1,056 (2.20 d) | 571 |
| 2. Turn-Broach Main Journals | 95.0 s | 45 min | 91% | 97.6% | 720 | 864 (1.80 d) | 488 |
| 3. Pin & Main Induction Harden | 120 s | 50 min | 84% | 96.1% | 720 | 1,152 (2.40 d) | 350 |
| 4. CBN Orbital Crankpin Grind | 86.0 s | 20 min | 93% | 98.4% | 480 | 720 (1.50 d) | 562 |
| 5. Superfinish Belt & Mag-Check | 63.0 s | 12 min | 97% | 99.6% | 240 | 384 (0.80 d) | 806 |
Key figures
- Takt time
- 113 s
- Lead time
- 10.7 d
- Value-added time
- 445 s
- Process cycle efficiency (PCE)
- 0.077%
- Rolled throughput yield (RTY)
- 90.8%
- Customer demand per day
- 480 parts
- Line capacity per day
- 350 parts
- Bottleneck
- Pin & Main Induction Harden
Reading the bottleneck
The bottleneck is "Pin & Main Induction Harden": it can process 350 parts per day against a demand of 480 parts, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 120 s to 149 s, against a takt of 113 s. The largest loss at this step is equipment downtime (uptime 84%), about 22.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Bearings, Gears & Precision Fasteners: Bearings, Gears & Precision Fasteners
- Case-Hardened Automotive Tapered Roller Bearing
- Nickel-Alloy 718 High-Temp 12-Point Aero Bolt
- 5-Flute AlTiN Coated Solid Carbide Endmill
- Pre-Loaded C3 Precision Ground Ball Screw
- Hot-Forged Lead-Free Brass Radiant Manifold
- Sub-Millimeter Titanium Orthopedic Bone Screw
- Powder-Metal Sintered Variable Cam Phaser Rotor
- Parabolic Taper-Rolled Truck Suspension Leaf
- Precision ANSI/DIN Heavy Conveyor Roller Chain
- ASME B16.5 Forged 316L Weld-Neck Pipe Flange
- Active Magnetic Bearing Turbo-Expander Cartridge