5-Flute AlTiN Coated Solid Carbide Endmill

Product family: Precision CNC Cutting Tools.

Flow: Carbide rod supplier → Blank Laser Length & Center → 6-Axis CNC Cylindrical Grind → 5-Axis Helical Flute Grind → PVD AlTiN Arc Plasma Coat → 3D Laser Edge Radius Measure → CNC Machining Distributors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 5-Flute AlTiN Coated Solid Carbide EndmillSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Carbide rod supplier → Blank Laser Length & Center (20.8 s) → 6-Axis CNC Cylindrical Grind (24.3 s) → 5-Axis Helical Flute Grind (31.0 s) → PVD AlTiN Arc Plasma Coat (22.0 s) → 3D Laser Edge Radius Measure (16.2 s) → CNC Machining Distributors.SUPPLIERCarbide rodsupplierI2.20 d1Blank LaserLength & CenterC/T 20.8 sI1.80 d26-Axis CNCCylindrical GrindC/T 24.3 sI2.40 d35-Axis HelicalFlute GrindC/T 31.0 sI1.50 d4PVD AlTiN ArcPlasma CoatC/T 22.0 sI0.80 d53D Laser EdgeRadius MeasureC/T 16.2 sI2.00 dCUSTOMERCNC MachiningDistributors2,800 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Blank Laser Length & Center20.8 s65 min90%98.8%5,6006,160 (2.20 d)3,379
2. 6-Axis CNC Cylindrical Grind24.3 s45 min91%97.6%4,2005,040 (1.80 d)2,895
3. 5-Axis Helical Flute Grind31.0 s50 min84%96.1%4,2006,720 (2.40 d)2,057
4. PVD AlTiN Arc Plasma Coat22.0 s20 min93%98.4%2,8004,200 (1.50 d)3,319
5. 3D Laser Edge Radius Measure16.2 s12 min97%99.6%1,4002,240 (0.80 d)4,745

Key figures

Takt time
28.9 s
Lead time
10.7 d
Value-added time
114 s
Process cycle efficiency (PCE)
0.013%
Rolled throughput yield (RTY)
90.8%
Customer demand per day
2,800 parts
Line capacity per day
2,057 parts
Bottleneck
5-Axis Helical Flute Grind

Reading the bottleneck

The bottleneck is "5-Axis Helical Flute Grind": it can process 2,057 parts per day against a demand of 2,800 parts, so it falls short of demand by 26.5%. Once downtime and scrap are counted, its cycle time grows from 31.0 s to 38.4 s, against a takt of 28.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 5.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.