Parabolic Taper-Rolled Truck Suspension Leaf
Product family: 51CrV4 Heavy Leaf Springs.
Flow: Spring-steel flat supplier → Hot Parabolic Taper Rolling → Eye Curl & Bush Punch → Austenitize Form & Oil Quench → Stress Shot-Peen Arc Side → Center-Bolt Clamp & Pre-Set → Commercial Axle Builders
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Hot Parabolic Taper Rolling | 61.0 s | 65 min | 90% | 98.8% | 1,280 | 1,408 (2.20 d) | 759 |
| 2. Eye Curl & Bush Punch | 71.0 s | 45 min | 91% | 97.6% | 960 | 1,152 (1.80 d) | 653 |
| 3. Austenitize Form & Oil Quench | 90.0 s | 50 min | 84% | 96.1% | 960 | 1,536 (2.40 d) | 466 |
| 4. Stress Shot-Peen Arc Side | 64.0 s | 20 min | 93% | 98.4% | 640 | 960 (1.50 d) | 755 |
| 5. Center-Bolt Clamp & Pre-Set | 47.0 s | 12 min | 97% | 99.6% | 320 | 512 (0.80 d) | 1,080 |
Key figures
- Takt time
- 84.4 s
- Lead time
- 10.7 d
- Value-added time
- 333 s
- Process cycle efficiency (PCE)
- 0.058%
- Rolled throughput yield (RTY)
- 90.8%
- Customer demand per day
- 640 parts
- Line capacity per day
- 466 parts
- Bottleneck
- Austenitize Form & Oil Quench
Reading the bottleneck
The bottleneck is "Austenitize Form & Oil Quench": it can process 466 parts per day against a demand of 640 parts, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 90.0 s to 111 s, against a takt of 84.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 17.1 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Bearings, Gears & Precision Fasteners: Bearings, Gears & Precision Fasteners
- Case-Hardened Automotive Tapered Roller Bearing
- Nickel-Alloy 718 High-Temp 12-Point Aero Bolt
- 5-Flute AlTiN Coated Solid Carbide Endmill
- Pre-Loaded C3 Precision Ground Ball Screw
- Induction-Hardened 4-Cyl Forged Crankshaft
- Hot-Forged Lead-Free Brass Radiant Manifold
- Sub-Millimeter Titanium Orthopedic Bone Screw
- Powder-Metal Sintered Variable Cam Phaser Rotor
- Precision ANSI/DIN Heavy Conveyor Roller Chain
- ASME B16.5 Forged 316L Weld-Neck Pipe Flange
- Active Magnetic Bearing Turbo-Expander Cartridge