Powder-Metal Sintered Variable Cam Phaser Rotor

Product family: Net-Shape PM Auto Sprockets.

Flow: Metal powder supplier → 800T Precision Powder Compact → 1140°C Mesh-Belt Sinter → CNC Sizing Coining & Steam → Seal Slot Fine Grind & Honing → Laser Contour & Eddy QC → Automotive Engine Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Powder-Metal Sintered Variable Cam Phaser RotorSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Metal powder supplier → 800T Precision Powder Compact (12.7 s) → 1140°C Mesh-Belt Sinter (14.8 s) → CNC Sizing Coining & Steam (18.8 s) → Seal Slot Fine Grind & Honing (13.4 s) → Laser Contour & Eddy QC (9.9 s) → Automotive Engine Assembly.SUPPLIERMetal powdersupplierI2.20 d1800T PrecisionPowder CompactC/T 12.7 sI1.80 d21140°C Mesh-BeltSinterC/T 14.8 sI2.40 d3CNC SizingCoining & SteamC/T 18.8 sI1.50 d4Seal Slot FineGrind & HoningC/T 13.4 sI0.80 d5Laser Contour &Eddy QCC/T 9.9 sI2.00 dCUSTOMERAutomotiveEngine Assembly4,600 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 800T Precision Powder Compact12.7 s65 min90%98.8%9,20010,120 (2.20 d)5,535
2. 1140°C Mesh-Belt Sinter14.8 s45 min91%97.6%6,9008,280 (1.80 d)4,753
3. CNC Sizing Coining & Steam18.8 s50 min84%96.1%6,90011,040 (2.40 d)3,392
4. Seal Slot Fine Grind & Honing13.4 s20 min93%98.4%4,6006,900 (1.50 d)5,450
5. Laser Contour & Eddy QC9.9 s12 min97%99.6%2,3003,680 (0.80 d)7,764

Key figures

Takt time
17.6 s
Lead time
10.7 d
Value-added time
69.6 s
Process cycle efficiency (PCE)
0.008%
Rolled throughput yield (RTY)
90.8%
Customer demand per day
4,600 parts
Line capacity per day
3,392 parts
Bottleneck
CNC Sizing Coining & Steam

Reading the bottleneck

The bottleneck is "CNC Sizing Coining & Steam": it can process 3,392 parts per day against a demand of 4,600 parts, so it falls short of demand by 26.3%. Once downtime and scrap are counted, its cycle time grows from 18.8 s to 23.3 s, against a takt of 17.6 s. The largest loss at this step is equipment downtime (uptime 84%), about 3.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.