Robotics, Automation & Additive 3D VSM Scenarios
12 scenarios of Robotics, Automation & Additive 3D, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Actuator Housing CNC & Print → Harmonic Reducer & Servo Fit → 6-Axis Arm Calibration & Burn-In → Vision Camera & Safety PLC Mate → ISO 9283 Repeatability Sign-Off. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 6-Axis Collaborative Robot (Cobot) Line | 85 units per day | 2 | 635 s | 8.25 d | 0.56% | Joint Internal Bus Threading |
| Quad-Laser Titanium LPBF Additive Cell | 110 parts per day | 3 | 736 s | 8.24 d | 0.44% | Wire-EDM Cut & Powder Sieve |
| 1.5T SLAM Lidar Autonomous Mobile Robot | 42 units per day | 2 | 1,286 s | 8.28 d | 1.1% | Safety Lidar & ROS2 PC Mount |
| End-of-Line High-Speed Robotic Palletizer Cell | 12 units per day | 1 | 2,250 s | 8.50 d | 3.9% | Infeed Belt & Safety Curtain |
| High-Speed 6m Linear Motor Pick Gantry | 38 units per day | 2 | 1,421 s | 8.31 d | 1.3% | Linear Forcer & Air Bearing Fit |
| IP69K Hygienic Stainless Food Delta Robot | 28 units per day | 2 | 1,929 s | 8.36 d | 1.7% | Direct-Drive Servo Seal Fit |
| Scanner-Guided 6kW Remote Laser Welding Head | 45 units per day | 1 | 600 s | 8.29 d | 1.1% | Galvo Mirror Encoder Align |
| EFEM Cleanroom Dual-Blade Wafer Handler | 32 units per day | 2 | 1,688 s | 8.31 d | 1.5% | Magnetic Ferrofluid Seal Fit |
| 12-Station Servo CNC Tool Changer Turret | 75 units per day | 2 | 720 s | 8.27 d | 0.64% | Hydraulic Clamp Piston Seal |
| High-Volume Metal Binder-Jet 3D Print Line | 950 parts per day | 3 | 85.3 s | 8.20 d | 0.051% | Debind & Vacuum Sinter Profile |
| AI Hyperspectral Optical Food & Plastic Sorter | 16 units per day | 1 | 1,688 s | 8.43 d | 2.9% | 256 High-Speed Air Valve Bar |
| Multilevel Warehouse AS/RS Rail Shuttle | 55 units per day | 2 | 982 s | 8.29 d | 0.87% | Supercapacitor 20s Charge Fit |