AI Hyperspectral Optical Food & Plastic Sorter

Product family: 120-Jet Ejector Sorting Decks.

Flow: NIR camera supplier → Stainless Chute & Shaker Weld → NIR/RGB Optical Hood Align → 256 High-Speed Air Valve Bar → FPGA Model & Delay Calibrate → Defect Rejection >99.4% Trial → Agri & Recycling Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: AI Hyperspectral Optical Food & Plastic SorterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. NIR camera supplier → Stainless Chute & Shaker Weld (1,181 s) → NIR/RGB Optical Hood Align (1,418 s) → 256 High-Speed Air Valve Bar (1,806 s) → FPGA Model & Delay Calibrate (1,283 s) → Defect Rejection >99.4% Trial (979 s) → Agri & Recycling Plants.SUPPLIERNIR camerasupplierI1.81 d1Stainless Chute &Shaker WeldC/T 1,181 sI1.50 d2NIR/RGB OpticalHood AlignC/T 1,418 sI2.00 d3256 High-SpeedAir Valve BarC/T 1,806 sI1.00 d4FPGA Model &Delay CalibrateC/T 1,283 sI0.69 d5Defect Rejection>99.4% TrialC/T 979 sI1.19 dCUSTOMERAgri &Recycling…16 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Stainless Chute & Shaker Weld1,181 s25 min94%98.4%1329 (1.81 d)20
2. NIR/RGB Optical Hood Align1,418 s20 min92%97.2%624 (1.50 d)15
3. 256 High-Speed Air Valve Bar1,806 s30 min85%94.8%832 (2.00 d)10
4. FPGA Model & Delay Calibrate1,283 s12 min95%98.0%416 (1.00 d)18
5. Defect Rejection >99.4% Trial979 s10 min97%99.1%211 (0.69 d)22

Key figures

Takt time
1,688 s
Lead time
8.43 d
Value-added time
6,667 s
Process cycle efficiency (PCE)
2.9%
Rolled throughput yield (RTY)
88.1%
Customer demand per day
16 units
Line capacity per day
10 units
Bottleneck
256 High-Speed Air Valve Bar

Reading the bottleneck

The bottleneck is "256 High-Speed Air Valve Bar": it can process 10 units per day against a demand of 16 units, so it falls short of demand by 34.7%. Once downtime and scrap are counted, its cycle time grows from 1,806 s to 2,241 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 85%), about 319 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.