High-Speed 6m Linear Motor Pick Gantry

Product family: Ironless Linear Servo Axes.

Flow: Linear guide & drive supplier → Al Beam Precision Rail Grind → Magnet Track Pitch Bonding → Linear Forcer & Air Bearing Fit → Sub-Micron Optical Scale Align → Laser Interferometer Pitch QC → Electronics & Lab Automators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Speed 6m Linear Motor Pick GantrySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Linear guide & drive supplier → Al Beam Precision Rail Grind (995 s) → Magnet Track Pitch Bonding (1,194 s) → Linear Forcer & Air Bearing Fit (1,521 s) → Sub-Micron Optical Scale Align (1,080 s) → Laser Interferometer Pitch QC (824 s) → Electronics & Lab Automators.SUPPLIERLinear guide &drive supplierI1.79 d1Al Beam PrecisionRail GrindC/T 995 sI1.50 d2Magnet TrackPitch BondingC/T 1,194 sI2.00 d3Linear Forcer &Air Bearing FitC/T 1,521 sI1.00 d4Sub-MicronOptical Scale…C/T 1,080 sI0.71 d5LaserInterferometer…C/T 824 sI1.21 dCUSTOMERElectronics &Lab Automators38 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Al Beam Precision Rail Grind995 s25 min94%98.4%3068 (1.79 d)48
2. Magnet Track Pitch Bonding1,194 s20 min92%97.2%1557 (1.50 d)38
3. Linear Forcer & Air Bearing Fit1,521 s30 min85%94.8%1976 (2.00 d)27
4. Sub-Micron Optical Scale Align1,080 s12 min95%98.0%1038 (1.00 d)44
5. Laser Interferometer Pitch QC824 s10 min97%99.1%627 (0.71 d)59

Key figures

Takt time
1,421 s
Lead time
8.31 d
Value-added time
5,614 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
88.1%
Customer demand per day
38 units
Line capacity per day
27 units
Bottleneck
Linear Forcer & Air Bearing Fit

Reading the bottleneck

The bottleneck is "Linear Forcer & Air Bearing Fit": it can process 27 units per day against a demand of 38 units, so it falls short of demand by 29.7%. Once downtime and scrap are counted, its cycle time grows from 1,521 s to 1,888 s, against a takt of 1,421 s. The largest loss at this step is equipment downtime (uptime 85%), about 268 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.