Multilevel Warehouse AS/RS Rail Shuttle

Product family: High-Throughput Tote Shuttles.

Flow: Supercapacitors & Al Chassis → Al Rail Chassis CNC & Rivet → Twin-Belt Telescopic Fork Build → Supercapacitor 20s Charge Fit → Track Wheel & Laser Position → Dynamic Tote Pull Endurance → Cold & E-Commerce AS/RS

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multilevel Warehouse AS/RS Rail ShuttleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Supercapacitors & Al Chassis → Al Rail Chassis CNC & Rivet (687 s) → Twin-Belt Telescopic Fork Build (825 s) → Supercapacitor 20s Charge Fit (1,051 s) → Track Wheel & Laser Position (746 s) → Dynamic Tote Pull Endurance (569 s) → Cold & E-Commerce AS/RS.SUPPLIERSupercapacitors& Al ChassisI1.80 d1Al Rail ChassisCNC & RivetC/T 687 sI1.51 d2Twin-BeltTelescopic Fork…C/T 825 sI2.00 d3Supercapacitor20s Charge FitC/T 1,051 sI1.00 d4Track Wheel &Laser PositionC/T 746 sI0.71 d5Dynamic Tote PullEnduranceC/T 569 sI1.20 dCUSTOMERCold &E-Commerce…55 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Al Rail Chassis CNC & Rivet687 s25 min94%98.4%4499 (1.80 d)70
2. Twin-Belt Telescopic Fork Build825 s20 min92%97.2%2283 (1.51 d)55
3. Supercapacitor 20s Charge Fit1,051 s30 min85%94.8%28110 (2.00 d)39
4. Track Wheel & Laser Position746 s12 min95%98.0%1455 (1.00 d)64
5. Dynamic Tote Pull Endurance569 s10 min97%99.1%839 (0.71 d)84

Key figures

Takt time
982 s
Lead time
8.29 d
Value-added time
3,878 s
Process cycle efficiency (PCE)
0.87%
Rolled throughput yield (RTY)
88.1%
Customer demand per day
55 units
Line capacity per day
39 units
Bottleneck
Supercapacitor 20s Charge Fit

Reading the bottleneck

The bottleneck is "Supercapacitor 20s Charge Fit": it can process 39 units per day against a demand of 55 units, so it falls short of demand by 29.7%. Once downtime and scrap are counted, its cycle time grows from 1,051 s to 1,304 s, against a takt of 982 s. The largest loss at this step is equipment downtime (uptime 85%), about 185 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.