EFEM Cleanroom Dual-Blade Wafer Handler

Product family: ISO-1 Vacuum Transfer Robots.

Flow: Alumina Ceramic Arms → UHV Nickel Housing Electropol → Ceramic Arm End-Effector Bond → Magnetic Ferrofluid Seal Fit → Particle Shedding Laser Count → 20,000-Pick Wafer Accuracy → 300mm Semiconductor Fabs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: EFEM Cleanroom Dual-Blade Wafer HandlerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Alumina Ceramic Arms → UHV Nickel Housing Electropol (1,181 s) → Ceramic Arm End-Effector Bond (1,418 s) → Magnetic Ferrofluid Seal Fit (1,806 s) → Particle Shedding Laser Count (1,283 s) → 20,000-Pick Wafer Accuracy (979 s) → 300mm Semiconductor Fabs.SUPPLIERAlumina CeramicArmsI1.81 d1UHV NickelHousing…C/T 1,181 sI1.50 d2Ceramic ArmEnd-Effector BondC/T 1,418 sI2.00 d3MagneticFerrofluid Seal…C/T 1,806 sI1.00 d4Particle SheddingLaser CountC/T 1,283 sI0.69 d520,000-Pick WaferAccuracyC/T 979 sI1.19 dCUSTOMER300mmSemiconductor…32 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. UHV Nickel Housing Electropol1,181 s25 min94%98.4%2658 (1.81 d)41
2. Ceramic Arm End-Effector Bond1,418 s20 min92%97.2%1348 (1.50 d)32
3. Magnetic Ferrofluid Seal Fit1,806 s30 min85%94.8%1664 (2.00 d)22
4. Particle Shedding Laser Count1,283 s12 min95%98.0%832 (1.00 d)37
5. 20,000-Pick Wafer Accuracy979 s10 min97%99.1%522 (0.69 d)49

Key figures

Takt time
1,688 s
Lead time
8.31 d
Value-added time
6,667 s
Process cycle efficiency (PCE)
1.5%
Rolled throughput yield (RTY)
88.1%
Customer demand per day
32 units
Line capacity per day
22 units
Bottleneck
Magnetic Ferrofluid Seal Fit

Reading the bottleneck

The bottleneck is "Magnetic Ferrofluid Seal Fit": it can process 22 units per day against a demand of 32 units, so it falls short of demand by 29.7%. Once downtime and scrap are counted, its cycle time grows from 1,806 s to 2,241 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 85%), about 319 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.