Modular Stainless Intralogistics Conveyor
Product family: Bolt-Together Roller Frames.
Flow: Stainless Strip Coils → Roll-Punch Side Channel → Laser Bracket Cross-Tie → Passivation Pickling Bath → 24V Drive Roller Snap-In → Run-Out Alignment Check → Fulfillment Automators
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Roll-Punch Side Channel | 118 s | 20 min | 94% | 99.1% | 465 | 558 (1.80 d) | 420 |
| 2. Laser Bracket Cross-Tie | 125 s | 10 min | 95% | 98.4% | 155 | 372 (1.20 d) | 395 |
| 3. Passivation Pickling Bath | 188 s | 55 min | 84% | 95.2% | 248 | 651 (2.10 d) | 212 |
| 4. 24V Drive Roller Snap-In | 146 s | 35 min | 90% | 96.8% | 372 | 527 (1.70 d) | 312 |
| 5. Run-Out Alignment Check | 108 s | 10 min | 96% | 99.0% | 93 | 279 (0.90 d) | 458 |
Key figures
- Takt time
- 174 s
- Lead time
- 8.91 d
- Value-added time
- 685 s
- Process cycle efficiency (PCE)
- 0.14%
- Rolled throughput yield (RTY)
- 89.0%
- Customer demand per day
- 310 units
- Line capacity per day
- 212 units
- Bottleneck
- Passivation Pickling Bath
Reading the bottleneck
The bottleneck is "Passivation Pickling Bath": it can process 212 units per day against a demand of 310 units, so it falls short of demand by 31.6%. Once downtime and scrap are counted, its cycle time grows from 188 s to 235 s, against a takt of 174 s. The largest loss at this step is equipment downtime (uptime 84%), about 35.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Sheet Metal, Laser & Powder Coat: Sheet Metal, Laser & Powder Coat
- Sheet Metal Laser, Bending & Powder Coat
- 42U Hyperscale Data Center Rack Enclosure
- Brushed Stainless Elevator Cabin Wall Line
- Galvanized Spiral & Rectangular HVAC Duct Line
- Torque-Tube Roll-Formed Solar Tracker Beam
- Sanitary Welded 316L Stainless Feed Hopper
- Sound-Attenuated Diesel Genset Canopy
- UL-291 Bank ATM High-Security Safe Chest
- Commercial UL Grease-Filter Exhaust Hood
- Telescopic Hexagonal Mobile Crane Boom
- Flush Pharma Cleanroom Airlock Partition