Sanitary Welded 316L Stainless Feed Hopper

Product family: Mirror-Polish Food Hoppers.

Flow: 316L steel supplier → Waterjet & Roll Cylinder → Orbital TIG Purge Welding → Electropolish Ra<0.4um Buff → Dye Penetrant Clean Audit → Load-Cell Pad Torque → Food Processing OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sanitary Welded 316L Stainless Feed HopperSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 316L steel supplier → Waterjet & Roll Cylinder (656 s) → Orbital TIG Purge Welding (694 s) → Electropolish Ra<0.4um Buff (1,041 s) → Dye Penetrant Clean Audit (810 s) → Load-Cell Pad Torque (598 s) → Food Processing OEMs.SUPPLIER316L steelsupplierI1.79 d1Waterjet & RollCylinderC/T 656 sI1.21 d2Orbital TIG PurgeWeldingC/T 694 sI2.11 d3ElectropolishRa<0.4um BuffC/T 1,041 sI1.71 d4Dye PenetrantClean AuditC/T 810 sI0.89 d5Load-Cell PadTorqueC/T 598 sI1.21 dCUSTOMERFood ProcessingOEMs28 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Waterjet & Roll Cylinder656 s20 min94%99.1%4250 (1.79 d)37
2. Orbital TIG Purge Welding694 s10 min95%98.4%1434 (1.21 d)35
3. Electropolish Ra<0.4um Buff1,041 s55 min84%95.2%2259 (2.11 d)18
4. Dye Penetrant Clean Audit810 s35 min90%96.8%3448 (1.71 d)27
5. Load-Cell Pad Torque598 s10 min96%99.0%825 (0.89 d)40

Key figures

Takt time
964 s
Lead time
9.07 d
Value-added time
3,799 s
Process cycle efficiency (PCE)
1.6%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
28 units
Line capacity per day
18 units
Bottleneck
Electropolish Ra<0.4um Buff

Reading the bottleneck

The bottleneck is "Electropolish Ra<0.4um Buff": it can process 18 units per day against a demand of 28 units, so it falls short of demand by 37.4%. Once downtime and scrap are counted, its cycle time grows from 1,041 s to 1,302 s, against a takt of 964 s. The largest loss at this step is equipment downtime (uptime 84%), about 198 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.