Galvanized Spiral & Rectangular HVAC Duct Line

Product family: TDC Commercial Air Ducts.

Flow: Galvanized coil supplier → Decoil, Bead & Shear Cut → Lock-Seam Roll Form → Auto Flange TDC Corner Fit → Gasket Sealant Mastic Bead → Stack Nesting & Site Tag → MEP Mechanical Contractors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Galvanized Spiral & Rectangular HVAC Duct LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Galvanized coil supplier → Decoil, Bead & Shear Cut (38.7 s) → Lock-Seam Roll Form (41.0 s) → Auto Flange TDC Corner Fit (61.0 s) → Gasket Sealant Mastic Bead (48.0 s) → Stack Nesting & Site Tag (35.2 s) → MEP Mechanical Contractors.SUPPLIERGalvanized coilsupplierI1.80 d1Decoil, Bead &Shear CutC/T 38.7 sI1.20 d2Lock-Seam RollFormC/T 41.0 sI2.10 d3Auto Flange TDCCorner FitC/T 61.0 sI1.70 d4Gasket SealantMastic BeadC/T 48.0 sI0.90 d5Stack Nesting &Site TagC/T 35.2 sI1.20 dCUSTOMERMEP MechanicalContractors950 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Decoil, Bead & Shear Cut38.7 s20 min94%99.1%1,4251,710 (1.80 d)1,281
2. Lock-Seam Roll Form41.0 s10 min95%98.4%4751,140 (1.20 d)1,204
3. Auto Flange TDC Corner Fit61.0 s55 min84%95.2%7601,995 (2.10 d)654
4. Gasket Sealant Mastic Bead48.0 s35 min90%96.8%1,1401,615 (1.70 d)948
5. Stack Nesting & Site Tag35.2 s10 min96%99.0%285855 (0.90 d)1,404

Key figures

Takt time
56.8 s
Lead time
8.90 d
Value-added time
224 s
Process cycle efficiency (PCE)
0.047%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
950 parts
Line capacity per day
654 parts
Bottleneck
Auto Flange TDC Corner Fit

Reading the bottleneck

The bottleneck is "Auto Flange TDC Corner Fit": it can process 654 parts per day against a demand of 950 parts, so it falls short of demand by 31.2%. Once downtime and scrap are counted, its cycle time grows from 61.0 s to 76.3 s, against a takt of 56.8 s. The largest loss at this step is equipment downtime (uptime 84%), about 11.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Sheet Metal, Laser & Powder Coat: Sheet Metal, Laser & Powder Coat