42U Hyperscale Data Center Rack Enclosure

Product family: Perforated Steel Server Cabinets.

Flow: Cold-rolled steel mill → Turret Punch & Laser Nest → Side-Post Weld & Earthing → Automated Press-Brake Cell → Conductive Powder Cure → Caster, Lock & Door Assemble → Cloud Data Center Integrators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 42U Hyperscale Data Center Rack EnclosureSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cold-rolled steel mill → Turret Punch & Laser Nest (204 s) → Side-Post Weld & Earthing (216 s) → Automated Press-Brake Cell (324 s) → Conductive Powder Cure (252 s) → Caster, Lock & Door Assemble (186 s) → Cloud Data Center Integrators.SUPPLIERCold-rolledsteel millI1.80 d1Turret Punch &Laser NestC/T 204 sI1.20 d2Side-Post Weld &EarthingC/T 216 sI2.10 d3AutomatedPress-Brake CellC/T 324 sI1.70 d4Conductive PowderCureC/T 252 sI0.90 d5Caster, Lock &Door AssembleC/T 186 sI1.20 dCUSTOMERCloud DataCenter…180 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Turret Punch & Laser Nest204 s20 min94%99.1%270324 (1.80 d)243
2. Side-Post Weld & Earthing216 s10 min95%98.4%90216 (1.20 d)229
3. Automated Press-Brake Cell324 s55 min84%95.2%144378 (2.10 d)123
4. Conductive Powder Cure252 s35 min90%96.8%216306 (1.70 d)181
5. Caster, Lock & Door Assemble186 s10 min96%99.0%54162 (0.90 d)266

Key figures

Takt time
300 s
Lead time
8.92 d
Value-added time
1,182 s
Process cycle efficiency (PCE)
0.25%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
180 units
Line capacity per day
123 units
Bottleneck
Automated Press-Brake Cell

Reading the bottleneck

The bottleneck is "Automated Press-Brake Cell": it can process 123 units per day against a demand of 180 units, so it falls short of demand by 31.6%. Once downtime and scrap are counted, its cycle time grows from 324 s to 405 s, against a takt of 300 s. The largest loss at this step is equipment downtime (uptime 84%), about 61.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.