Flush Pharma Cleanroom Airlock Partition
Product family: HPL & Powder-Coated Panels.
Flow: Galvanized Skins & Honeycomb → Servo Sheet Punch & Notch → Double-Sided Brake Fold → Pur Hot-Melt Core Press → Antimicrobial Coating Cure → Aluminum Cove Profile Pack → GMP Pharma Builders
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Servo Sheet Punch & Notch | 153 s | 20 min | 94% | 99.1% | 360 | 432 (1.80 d) | 324 |
| 2. Double-Sided Brake Fold | 162 s | 10 min | 95% | 98.4% | 120 | 288 (1.20 d) | 305 |
| 3. Pur Hot-Melt Core Press | 243 s | 55 min | 84% | 95.2% | 192 | 504 (2.10 d) | 164 |
| 4. Antimicrobial Coating Cure | 189 s | 35 min | 90% | 96.8% | 288 | 408 (1.70 d) | 241 |
| 5. Aluminum Cove Profile Pack | 140 s | 10 min | 96% | 99.0% | 72 | 216 (0.90 d) | 353 |
Key figures
- Takt time
- 225 s
- Lead time
- 8.92 d
- Value-added time
- 887 s
- Process cycle efficiency (PCE)
- 0.18%
- Rolled throughput yield (RTY)
- 89.0%
- Customer demand per day
- 240 parts
- Line capacity per day
- 164 parts
- Bottleneck
- Pur Hot-Melt Core Press
Reading the bottleneck
The bottleneck is "Pur Hot-Melt Core Press": it can process 164 parts per day against a demand of 240 parts, so it falls short of demand by 31.6%. Once downtime and scrap are counted, its cycle time grows from 243 s to 304 s, against a takt of 225 s. The largest loss at this step is equipment downtime (uptime 84%), about 46.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Sheet Metal, Laser & Powder Coat: Sheet Metal, Laser & Powder Coat
- Sheet Metal Laser, Bending & Powder Coat
- 42U Hyperscale Data Center Rack Enclosure
- Brushed Stainless Elevator Cabin Wall Line
- Galvanized Spiral & Rectangular HVAC Duct Line
- Torque-Tube Roll-Formed Solar Tracker Beam
- Sanitary Welded 316L Stainless Feed Hopper
- Sound-Attenuated Diesel Genset Canopy
- UL-291 Bank ATM High-Security Safe Chest
- Modular Stainless Intralogistics Conveyor
- Commercial UL Grease-Filter Exhaust Hood
- Telescopic Hexagonal Mobile Crane Boom