Telescopic Hexagonal Mobile Crane Boom

Product family: High-Strength 960 Telescopic Sections.

Flow: UHSS steel supplier → Bevel Plasma Long Seam → 1000T Tandem Press Brake → Tandem SAW Long Seam Weld → Phased-Array UT 100% Scan → Wear Pad Bore & Anti-Corrode → Mobile Crane OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Telescopic Hexagonal Mobile Crane BoomSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. UHSS steel supplier → Bevel Plasma Long Seam (2,040 s) → 1000T Tandem Press Brake (2,160 s) → Tandem SAW Long Seam Weld (3,240 s) → Phased-Array UT 100% Scan (2,520 s) → Wear Pad Bore & Anti-Corrode (1,860 s) → Mobile Crane OEMs.SUPPLIERUHSS steelsupplierI1.78 d1Bevel Plasma LongSeamC/T 2,040 sI1.22 d21000T TandemPress BrakeC/T 2,160 sI2.11 d3Tandem SAW LongSeam WeldC/T 3,240 sI1.72 d4Phased-Array UT100% ScanC/T 2,520 sI0.89 d5Wear Pad Bore &Anti-CorrodeC/T 1,860 sI1.22 dCUSTOMERMobile CraneOEMs18 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Bevel Plasma Long Seam2,040 s20 min94%99.1%2732 (1.78 d)24
2. 1000T Tandem Press Brake2,160 s10 min95%98.4%922 (1.22 d)23
3. Tandem SAW Long Seam Weld3,240 s55 min84%95.2%1438 (2.11 d)12
4. Phased-Array UT 100% Scan2,520 s35 min90%96.8%2231 (1.72 d)18
5. Wear Pad Bore & Anti-Corrode1,860 s10 min96%99.0%516 (0.89 d)26

Key figures

Takt time
3,000 s
Lead time
9.16 d
Value-added time
11,820 s
Process cycle efficiency (PCE)
2.4%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
18 parts
Line capacity per day
12 parts
Bottleneck
Tandem SAW Long Seam Weld

Reading the bottleneck

The bottleneck is "Tandem SAW Long Seam Weld": it can process 12 parts per day against a demand of 18 parts, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 3,240 s to 4,052 s, against a takt of 3,000 s. The largest loss at this step is equipment downtime (uptime 84%), about 617 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Sheet Metal, Laser & Powder Coat: Sheet Metal, Laser & Powder Coat