Sheet Metal Laser, Bending & Powder Coat

Product family: Industrial Electrical Enclosures.

Flow: Steel Service Center → Fiber Laser Cutting → Deburring & Tapping → CNC Press-Brake & MIG Weld → Powder Coat & Cure Oven → Hardware & Gasket Pack → Switchgear OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sheet Metal Laser, Bending & Powder CoatSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Steel Service Center → Fiber Laser Cutting (82.0 s) → Deburring & Tapping (86.0 s) → CNC Press-Brake & MIG Weld (130 s) → Powder Coat & Cure Oven (101 s) → Hardware & Gasket Pack (74.0 s) → Switchgear OEMs.SUPPLIERSteel ServiceCenterI1.80 d1Fiber LaserCuttingC/T 82.0 sI1.20 d2Deburring &TappingC/T 86.0 sI2.10 d3CNC Press-Brake &MIG WeldC/T 130 sI1.70 d4Powder Coat &Cure OvenC/T 101 sI0.90 d5Hardware & GasketPackC/T 74.0 sI1.20 dCUSTOMERSwitchgear OEMs450 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Fiber Laser Cutting82.0 s20 min94%99.1%675810 (1.80 d)604
2. Deburring & Tapping86.0 s10 min95%98.4%225540 (1.20 d)574
3. CNC Press-Brake & MIG Weld130 s55 min84%95.2%360945 (2.10 d)307
4. Powder Coat & Cure Oven101 s35 min90%96.8%540765 (1.70 d)451
5. Hardware & Gasket Pack74.0 s10 min96%99.0%135405 (0.90 d)668

Key figures

Takt time
120 s
Lead time
8.91 d
Value-added time
473 s
Process cycle efficiency (PCE)
0.098%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
450 units
Line capacity per day
307 units
Bottleneck
CNC Press-Brake & MIG Weld

Reading the bottleneck

The bottleneck is "CNC Press-Brake & MIG Weld": it can process 307 units per day against a demand of 450 units, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 130 s to 163 s, against a takt of 120 s. The largest loss at this step is equipment downtime (uptime 84%), about 24.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.