National Blood Bank Platelets & FFP Cold Hub

Product family: 24/7 Emergency Blood Component.

Flow: Regional Donor Clinics → 22°C Agitator / -30°C Vault → Viral NAT Quarantine Release → Irradiation & Cross-Match Tag → Phase-Change Validated Cooler → Blue-Light STAT Van Delivery → Hospital Blood Transfusion

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: National Blood Bank Platelets & FFP Cold HubSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Regional Donor Clinics → 22°C Agitator / -30°C Vault (91.0 s) → Viral NAT Quarantine Release (140 s) → Irradiation & Cross-Match Tag (99.0 s) → Phase-Change Validated Cooler (112 s) → Blue-Light STAT Van Delivery (76.0 s) → Hospital Blood Transfusion.SUPPLIERRegional DonorClinicsI0.70 d122°C Agitator /-30°C VaultC/T 91.0 sI1.40 d2Viral NATQuarantine…C/T 140 sI1.20 d3Irradiation &Cross-Match TagC/T 99.0 sI0.80 d4Phase-ChangeValidated CoolerC/T 112 sI0.50 d5Blue-Light STATVan DeliveryC/T 76.0 sI0.70 dCUSTOMERHospital BloodTransfusion620 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 22°C Agitator / -30°C Vault91.0 s10 min96%98.8%248434 (0.70 d)829
2. Viral NAT Quarantine Release140 s15 min87%95.0%310868 (1.40 d)468
3. Irradiation & Cross-Match Tag99.0 s8 min94%98.4%186744 (1.20 d)742
4. Phase-Change Validated Cooler112 s8 min92%97.6%124496 (0.80 d)630
5. Blue-Light STAT Van Delivery76.0 s10 min96%99.1%155310 (0.50 d)984

Key figures

Takt time
131 s
Lead time
5.31 d
Value-added time
518 s
Process cycle efficiency (PCE)
0.12%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
620 packs
Line capacity per day
468 packs
Bottleneck
Viral NAT Quarantine Release

Reading the bottleneck

The bottleneck is "Viral NAT Quarantine Release": it can process 468 packs per day against a demand of 620 packs, so it falls short of demand by 24.6%. Once downtime and scrap are counted, its cycle time grows from 140 s to 169 s, against a takt of 131 s. The largest loss at this step is equipment downtime (uptime 87%), about 20.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.