4°C Fresh Cut-Flower Vacuum Cool & Bouquet Hub

Product family: Wet-Bucket Flower Trolleys.

Flow: Kenya / Ecuador Air Blooms → Air-Cargo Vacuum Precooler → Phyto-Sanitary Quarantine → Hydrated Bucket Line → Auction Clock Batch Sort → 4°C Curtain Florist Truck → European Florist Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 4°C Fresh Cut-Flower Vacuum Cool & Bouquet HubSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Kenya / Ecuador Air Blooms → Air-Cargo Vacuum Precooler (9.9 s) → Phyto-Sanitary Quarantine (15.2 s) → Hydrated Bucket Line (10.8 s) → Auction Clock Batch Sort (12.2 s) → 4°C Curtain Florist Truck (8.2 s) → European Florist Chains.SUPPLIERKenya / EcuadorAir BloomsI0.70 d1Air-Cargo VacuumPrecoolerC/T 9.9 sI1.40 d2Phyto-SanitaryQuarantineC/T 15.2 sI1.20 d3Hydrated BucketLineC/T 10.8 sI0.80 d4Auction ClockBatch SortC/T 12.2 sI0.50 d54°C CurtainFlorist TruckC/T 8.2 sI0.70 dCUSTOMEREuropeanFlorist Chains3,800 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Air-Cargo Vacuum Precooler9.9 s10 min96%98.8%1,5202,660 (0.70 d)5,030
2. Phyto-Sanitary Quarantine15.2 s15 min87%95.0%1,9005,320 (1.40 d)2,838
3. Hydrated Bucket Line10.8 s8 min94%98.4%1,1404,560 (1.20 d)4,488
4. Auction Clock Batch Sort12.2 s8 min92%97.6%7603,040 (0.80 d)3,798
5. 4°C Curtain Florist Truck8.2 s10 min96%99.1%9501,900 (0.50 d)5,987

Key figures

Takt time
14.2 s
Lead time
5.30 d
Value-added time
56.3 s
Process cycle efficiency (PCE)
0.020%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
3,800 crates
Line capacity per day
2,838 crates
Bottleneck
Phyto-Sanitary Quarantine

Reading the bottleneck

The bottleneck is "Phyto-Sanitary Quarantine": it can process 2,838 crates per day against a demand of 3,800 crates, so it falls short of demand by 25.3%. Once downtime and scrap are counted, its cycle time grows from 15.2 s to 18.4 s, against a takt of 14.2 s. The largest loss at this step is equipment downtime (uptime 87%), about 2.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.