Pressurized Ethylene Banana Ripening Cold Rooms

Product family: Chilled Ripened Crate Stages.

Flow: Tropical Reefer Vessels → Pulp Core Probe Reception → 72h Gas-Tight Ethylene Chamber → Forced-Air Color Stage 3.5 → Split-Case Crate Picking → 14°C Breathable Dispatch → Supermarket Produce Docks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Pressurized Ethylene Banana Ripening Cold RoomsSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Tropical Reefer Vessels → Pulp Core Probe Reception (27.0 s) → 72h Gas-Tight Ethylene Chamber (41.0 s) → Forced-Air Color Stage 3.5 (29.3 s) → Split-Case Crate Picking (33.2 s) → 14°C Breathable Dispatch (22.4 s) → Supermarket Produce Docks.SUPPLIERTropical ReeferVesselsI0.70 d1Pulp Core ProbeReceptionC/T 27.0 sI1.40 d272h Gas-TightEthylene ChamberC/T 41.0 sI1.20 d3Forced-Air ColorStage 3.5C/T 29.3 sI0.80 d4Split-Case CratePickingC/T 33.2 sI0.50 d514°C BreathableDispatchC/T 22.4 sI0.70 dCUSTOMERSupermarketProduce Docks1,400 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pulp Core Probe Reception27.0 s10 min96%98.8%560980 (0.70 d)1,844
2. 72h Gas-Tight Ethylene Chamber41.0 s15 min87%95.0%7001,960 (1.40 d)1,052
3. Forced-Air Color Stage 3.529.3 s8 min94%98.4%4201,680 (1.20 d)1,654
4. Split-Case Crate Picking33.2 s8 min92%97.6%2801,120 (0.80 d)1,396
5. 14°C Breathable Dispatch22.4 s10 min96%99.1%350700 (0.50 d)2,192

Key figures

Takt time
38.6 s
Lead time
5.30 d
Value-added time
153 s
Process cycle efficiency (PCE)
0.053%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
1,400 crates
Line capacity per day
1,052 crates
Bottleneck
72h Gas-Tight Ethylene Chamber

Reading the bottleneck

The bottleneck is "72h Gas-Tight Ethylene Chamber": it can process 1,052 crates per day against a demand of 1,400 crates, so it falls short of demand by 24.8%. Once downtime and scrap are counted, its cycle time grows from 41.0 s to 49.6 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 87%), about 6.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.